首页> 外文OA文献 >The Snow Melting Performance of the Natural Snow Melting Roof in the Wet : At Tochio Harumachi In Case of 2012 Winter
【2h】

The Snow Melting Performance of the Natural Snow Melting Roof in the Wet : At Tochio Harumachi In Case of 2012 Winter

机译:湿润的天然融雪屋顶的融雪性能:以2012年冬季为例的Tochio Harumachi

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

In the winter in 2012, the low temperature since 1984 continued and 210 cm snow was seen. When observing the performance of four kinds of roofs of the natural snow melting method of construction in it, the result like the following could be confirmed.①As for the maximum snow-load about the snow period, the ground met in 838kg/㎡ whereas 360-480kg/㎡ met.②Average drippig quantity of water about the continuous snow cover period was 8.87 - 9.77 kg / (㎡・day).③The melting away of snow of the roof of the natural snow melting method of construction, it became early on the 18-33 day compared with the ground.④It is because the cavity formed under the pipe in the freezing period, too, and the condensation moved ahead that the snow melting was progressional.⑤The performance of the 45 ° roof of the jungle gym type model was the best for the inside in the form of four kinds.
机译:在2012年的冬天,自1984年以来的低温仍在继续,并观测到210厘米的积雪。在观察其中四种自然融雪方法的屋顶的性能时,可以确认如下结果:①关于雪期的最大雪荷载,地面满足838kg /㎡,而360满足达到-480kg /㎡。②连续积雪期间的平均滴水量为8.87〜9.77kg /(㎡・天)。③自然融雪施工方法屋顶的积雪融化,早于④与地面相比,是18-33天。④也是因为在冻结期在管子下方形成了空洞,并且结露向前移动,融雪逐渐进行。⑤丛林体育馆型45°屋顶的性能模型是最适合内部的四种形式。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号