首页> 外文OA文献 >Integrated scheduling of a multi-product multi-factory manufacturing system with maritime transport limits
【2h】

Integrated scheduling of a multi-product multi-factory manufacturing system with maritime transport limits

机译:具有海运限制的多产品多工厂制造系统的集成调度

摘要

This paper studies a practical multi-factory job allocation and scheduling problem involving inland and maritime transport limits. A new heuristic called Due-date Based Cut-off rule (DBC) is developed to improve the computational efficiency of both exact and genetic algorithms (GA). Except the application of DBC, this proposed GA is guided by a novel fuzzy controller aimed at eliminating the drawbacks other GAs have when dealing with multi-factory models. The tests of the solution quality and computational efficiency for this GA are carried out. The numerical experiments demonstrate the value of the proposed approach in this practical global supply chain.
机译:本文研究了一个涉及内陆和海上运输限制的实际的多工厂工作分配和调度问题。开发了一种新的启发式方法,称为“基于截止日期的截止规则”(DBC),以提高精确算法和遗传算法(GA)的计算效率。除了DBC的应用外,该拟议的遗传算法还受到一种新颖的模糊控制器的指导,该控制器旨在消除其他遗传算法在处理多工厂模型时所具有的缺点。对该GA进行了解决方案质量和计算效率的测试。数值实验证明了该方法在实际的全球供应链中的价值。

著录项

  • 作者

    Sun XT; Chung SH; Chan FTS;

  • 作者单位
  • 年度 2015
  • 总页数
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号