In hot-mix asphalt (HMA) pavement construction, newly placed pavement must be sufficiently cooled before it can be opened to traffic. Estimation of the time required for pavement to reach a desired temperature level is necessary for highway agencies to make proper specifications and for contractors to plan for daily productions. In this study, energy exchange at the surface of newly laid HMA pavement was modeled as a function of time and weather conditions. Thermodynamics theory and finite-element method were used to model and simulate the cooling process. Field validation indicates that the modeling and simulation results match the observations reasonably well. The analysis procedure developed in this study can be used to predict HMA pavement cooling in different weather conditions. This paper contributes to the understanding of fundamental thermal exchanges in freshly placed HMA pavement, quantification of the influences of weather conditions and time on the thermal exchanges, and realistic estimation of pavement cooling time for better specification and production plans. It also facilitates future exploration of artificial cooling methods by reducing the number of site trials through computer simulations.
机译:在热混合沥青(HMA)路面结构中,新铺设的路面必须经过充分冷却后才能开放使用。估算路面达到所需温度水平所需的时间对于公路部门制定适当的规格以及承包商计划日常生产十分必要。在这项研究中,将新铺设的HMA路面表面的能量交换建模为时间和天气条件的函数。利用热力学理论和有限元方法对冷却过程进行建模和模拟。现场验证表明,建模和仿真结果与观测值相当吻合。本研究开发的分析程序可用于预测不同天气条件下的HMA路面降温。本文有助于了解新鲜放置的HMA路面中的基本热交换,量化天气条件和时间对热交换的影响,以及对路面冷却时间的实际估计,以提供更好的规格和生产计划。通过减少计算机模拟的现场试验次数,它还有助于将来探索人工冷却方法。

著录项

  • 作者

    Wang Y; Zhu S; Wong AST;

  • 作者单位
  • 年度 2014
  • 总页数
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号