Co-ordination of transformer tap and capacitor operation for reactive power voltage control in a distribution primary substation

机译:变压器抽头和电容器操作的配合,用于配电一次变电站的无功电压控制

摘要

This paper presents a method employing fuzzy dynamic programming (FDP) technique to determine a hourly dispatch schedule for the capacitor bank switching and on-load tap changer (OLTC) position in a distribution primary substation. The schedule co-ordinates OLTC and capacitor operation so as to reduce their number of operation while satisfying the constraints on bus voltage limits and the tolerable worst power factor for the main transformer. This will reduce the tap changer/transformer maintenance frequency, and hence improve the overall supply security. Historical data of a distribution primary substation in Hong Kong is applied to simulate the reactive power/voltage control operation in the substation. The results are analysed and compared with the current control mechanism, and the effectiveness of the proposed method is demonstrated.
机译:本文提出了一种使用模糊动态规划(FDP)技术来确定配电主变电站中电容器组开关和有载分接开关(OLTC)位置的每小时调度计划的方法。该调度表协调OLTC和电容器的工作,以减少其工作次数,同时满足总线电压限制和主变压器可容忍的最差功率因数的约束。这将减少分接开关/变压器的维护频率,从而提高总体电源安全性。使用香港配电主变电站的历史数据来模拟变电站中的无功/电压控制操作。对结果进行了分析,并与目前的控制机制进行了比较,证明了该方法的有效性。

著录项

  • 作者

    Wong TK; Mak CM; Chung TS;

  • 作者单位
  • 年度 2000
  • 总页数
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号