首页> 外文OA文献 >A case study for advanced planning and scheduling (APS)
【2h】

A case study for advanced planning and scheduling (APS)

机译:高级计划和排程(APS)的案例研究

摘要

This paper presents a case study for the advanced planning and scheduling (APS) problem encountered in a light source manufacturer. The APS problem explicitly considers due dates of products, operation sequences among items, and capacity constraints of the manufacturing system. The objective of the problem is to seek the minimum cost of both production idle time and tardiness or earliness penalty of an order. An intelligent heuristic is applied to the problem, and the results demonstrate that significant production performances can be achieved while ensuring customer satisfaction as opposed to normal practices followed in the company relying on human expertise.
机译:本文提供了一个案例研究,用于光源制造商中遇到的高级计划和调度(APS)问题。 APS问题明确考虑了产品的到期日期,项目之间的操作顺序以及制造系统的产能限制。该问题的目的是寻求生产空闲时间和订单的拖延或提早处罚的最小成本。将智能启发式方法应用于该问题,结果表明,在保证客户满意度的同时,可以实现重要的生产性能,这与公司依靠人类专业知识所遵循的通常做法相反。

著录项

  • 作者

    Chen K; Ji P; Wang Q;

  • 作者单位
  • 年度 2011
  • 总页数
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号