首页> 外文OA文献 >Evaluation of a continuous process improvement pilot program to reduce or eliminate Trident II D5 launcher processing authority documentation at the Strategic Weapons Facility, Atlantic
【2h】

Evaluation of a continuous process improvement pilot program to reduce or eliminate Trident II D5 launcher processing authority documentation at the Strategic Weapons Facility, Atlantic

机译:在大西洋战略武器设施​​评估一项持续过程改进试验计划,以减少或消除Trident II D5发射器处理授权文件

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

Strategic Weapons Facility, Atlantic (SWFLANT) launcher third level repair cycle requires extensive Trouble Failure Inspection/Rejection Report (TFIRR) processing authority documentation that results in a loss of contractor man-hours and third level repair cycle time. Strategic Systems Programs (SSP) is using Continuous Improvement (CI) events to optimize repair efforts to free manpower and facility resources to meet increasing repair demands. This thesis evaluated the SSP approved CI Pilot Program to reduce or eliminate TRIDENT II D5 launcher TFIRR processing authority documentation and reduce third level repair cycle times at the Northrop Grumman Electronic Systems-Marine Systems (NGES-MS) facilities at SWFLANT. The Pilot Program achieved a 20% reduction in the man-hours using the modified TFIRR process, demonstrated a more efficient workflow and reduced the total third level repair cycle time. Recommendations for reducing or eliminating excessive processing authority documentation at SWFLANT for the TRIDENT II D5 launcher sub-system include accepting and implementing the CI Pilot Program results for reducing and eliminating TFIRR processing authority documentation as permanent changes to the SSP operational procedures and establishing additional CI process reviews to identify opportunities for documentation and repair cycle time reductions.
机译:大西洋战略武器设施​​(SWFLANT)发射器的第三级维修周期需要大量的故障检查/拒绝报告(TFIRR)处理权限文档,这会导致承包商工时和第三级维修周期时间的损失。战略系统计划(SSP)正在使用持续改进(CI)事件来优化维修工作,以释放人力和设施资源以满足不断增长的维修需求。本文评估了SSP批准的CI试点计划,以减少或消除TRIDENT II D5发射器TFIRR处理授权文件,并减少SWFLANT的诺斯罗普·格鲁曼电子系统-海军系统(NGES-MS)设施的三级维修周期。试点计划使用改进的TFIRR流程将工时减少了20%,展示了更高效的工作流程并减少了总的第三级维修周期时间。建议在TRFLENT II D5发射器子系统上减少或消除SWFLANT的过多处理权限文档,包括接受和实施CI试点计划的结果,以减少和消除TFIRR处理权限文档作为对SSP操作程序的永久更改,并建立附加的CI流程进行审查,以发现减少记录和维修周期时间的机会。

著录项

相似文献

  • 外文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号