首页> 外文OA文献 >Cost analysis of civilian-sailor substitution plan for ashore Aircraft Intermediate Maintenance Departments
【2h】

Cost analysis of civilian-sailor substitution plan for ashore Aircraft Intermediate Maintenance Departments

机译:岸上飞机中级维修部门民用水兵替换计划的成本分析

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

This thesis provides a cost analysis of the plan to civilianize 4355 enlisted billets at ten shore-based Aircraft Intermediate Maintenance Departments (AIMDs). Total cost was determined for each UIC, billet, and rating. Active duty costs were compared to Government Service (GS)/Wage Grade (WG) workers and comparisons were calculated across currently funded billets. Specific savings for each AIMD, rating, total projected savings, and an Excel decision support tool are provided to aid the sponsor with decisions about which ratings, groups of ratings, or while UICs to Civ-Sub. A summary of potential sea shore rotation impacts is also included. The analysis revealed a potential personnel cost savings of 14.27%. When administrative and contractual costs are considered, along with the standard deviations inherent in this type of analysis, the overall cost effectiveness of Civ-Sub is negligible. Other effects must be considered, including active duty manpower reductions on host Naval Air Stations, significant shore duty billet reductions, costs above and beyond personnel, and retention. Potential retention effects could eventually affect manning levels at sea and ultimately damage afloat AIMD readiness. The cost savings ashore (assuming there are) from implementing Civ-Sub will not compensate for the inability to maintain aircraft and aircraft components while deployed.
机译:本文对10个岸上飞机中级维修部门(AIMD)的4355个入伍方坯进行平民化的计划进行了成本分析。确定了每个UIC,方坯和等级的总成本。将现役成本与政府服务(GS)/工资等级(WG)工人进行比较,并比较当前资助的方坯的比较。提供了每个AIMD的特定节省额,等级,预计的总节省额以及Excel决策支持工具,以帮助发起人做出关于哪些等级,等级组或UIC到Civ-Sub的决定。还包括潜在的海岸旋转影响摘要。分析显示,潜在的人员成本节省为14.27%。当考虑行政和合同成本,以及这种分析固有的标准偏差时,Civ-Sub的总体成本效率可以忽略不计。还必须考虑其他影响,包括减少海军海军航空站的现役人员,大幅减少岸边方坯,人员以外的成本以及保留费用。潜在的保留效果最终可能会影响海上人员配备水平,并最终破坏AIMD战备状态。实施Civ-Sub节省的岸上成本(假设有)将无法弥补部署时无法维护飞机和飞机组件的损失。

著录项

  • 作者

    Scott Matthew M.;

  • 作者单位
  • 年度 2006
  • 总页数
  • 原文格式 PDF
  • 正文语种
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号