首页> 外文OA文献 >The effects of inadequate component inspection on facility repair projects
【2h】

The effects of inadequate component inspection on facility repair projects

机译:组件检查不充分对设施维修项目的影响

摘要

Component inspection is an important part of the facilities management process, especially as repair projects play an increasing role in the life of public facilities management organizations. The decisions facility owners make with regard to component inspection effect the eventual success of their major facility repair projects. This thesis uses a total cost approach to evaluate the effect component inspection methods have on facility repair projects. This problem is examined by comparing the penalty cost of inadequate component inspection to the costs of alternate component inspection methods that could have minimized the penalty cost. A general framework is developed to classify the errors that occur in component inspection and predict the penalty costs. Six major facility repair projects in which inadequate component inspection led to penalty coasts are presented and analyzed. The evidence from these cases shows that owners should pursue more costly and more accurate component inspection methods. The reduction in penalty costs due to increased accuracy outweighs the added cost so that the total cost is less. These cases also point to the usefulness of automated non-contract component inspection strategy by facility owners that considers alternate component inspection methods as part of the design of facility repair projects. An understanding of the penalty cost concepts presented here will be useful to owners in the design of a component inspection strategy. Keywords: Theses; Case studies; Contract administration; Defect analysis; Concrete bridge decks; Airfield pavements. (kr)
机译:组件检查是设施管理过程中的重要组成部分,尤其是随着维修项目在公共设施管理组织的生活中扮演着越来越重要的角色。设施所有者就部件检查做出的决定会影响其主要设施维修项目的最终成功。本文采用总成本法来评估组件检查方法对设施维修项目的影响。通过比较不充分的组件检查的惩罚成本与可能使惩罚成本最小化的替代组件检查方法的开销,可以检查此问题。开发了一个通用框架来对在组件检查中发生的错误进行分类,并预测罚款成本。介绍并分析了六个主要的设施维修项目,这些项目中的组件检查不充分导致了惯性滑行。这些案例的证据表明,所有者应采用成本更高且更准确的组件检查方法。由于提高的准确性而导致的惩罚成本的减少超过了增加的成本,因此总成本更低。这些案例还指出了设施所有者采用自动非合同组件检查策略的有用性,该策略将替代组件检查方法视为设施维修项目设计的一部分。对此处介绍的罚款成本概念的理解将对所有者在组件检查策略的设计中很有用。关键字:论文;实例探究;合同管理;缺陷分析;混凝土桥面;机场人行道。 (kr)

著录项

  • 作者

    Cowell James William;

  • 作者单位
  • 年度 1988
  • 总页数
  • 原文格式 PDF
  • 正文语种 en_US
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号