首页> 外文OA文献 >An analysis of construction activities in the Piney Grove area and the impact on the Kinley Creek Watershed
【2h】

An analysis of construction activities in the Piney Grove area and the impact on the Kinley Creek Watershed

机译:Piney Grove地区的建筑活动及其对Kinley Creek流域的影响分析

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

The goal of this project was to evaluate the effect of recent road construction, in and around the Piney Grove - I-26 interchange, on the Kinley Creek Watershed (primarily the K-2 tributary). Specific objectives were to update the existing GIS data base and corresponding Drain:Edge link-node model to "current' conditions and evaluate various alternatives for changes in the watershed. (MM)
机译:该项目的目的是评估在皮尼格罗夫-I-26交汇处及其周围的近期道路建设对Kinley Creek流域(主要是K-2支流)的影响。具体目标是将现有的GIS数据库和相应的Drain:Edge链接节点模型更新为“当前”条件,并评估分水岭变化的各种替代方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号