首页> 外文OA文献 >Surface ship Shore Intermediate Maintenance Activity costs under Defense Business Operations Fund regulations
【2h】

Surface ship Shore Intermediate Maintenance Activity costs under Defense Business Operations Fund regulations

机译:国防业务运营基金法规下的水面舰艇岸上中级维护活动成本

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

The thesis develops a FY 95 manday rate for a Shore Intermediate Maintenance Activity (SIMA) using Department of Defense Financial Management Regulations (DoD FMR) for Defense Business Operations Fund (DBOF) Operations in support of Regional Maintenance goals. The manday rate calculated, $694.64, is compared with Naval Shipyard (NSY) composite manday rates for FY 95. The NSY manday rates ranged from a high of $661.80 to a low of $408.83 with an average of $513.35. The comparison is of the costs associated with levels of effort, without adjustments for differing productivities or efficiencies. Some deviations from DoD FMR and adjustments to NSY manday rates were required in order to make SIMA and NSY manday rates directly comparable. The thesis also shows that the majority of the costs associated with the operation of a SIMA are fixed; $76,324,797 of the $116,288,974 in total operating costs were fixed costs. Of the $39,964,177 identified as variable costs, $36,255,321 are unavoidable cost--the costs of materials and services to complete necessary repairs or maintenance which would be incurred by the Navy regardless of where the work was performed. The fixed cost nature of operating a SIMA contributes to the higher manday rate. Computations using hourly labor costs for production efforts resulted in a manday rate of $572.15 and identified $14,922,797 as the cost of maintaining a fixed production labor force. Using hourly labor costs for support efforts should provide additional reductions in the manday rate.
机译:本文使用国防部业务运营基金(DBOF)运营的国防部财务管理条例(DoD FMR)支持区域维护目标,为岸上中级维护活动(SIMA)制定了95财年的人工费率。计算得出的工时费率为694.64美元,与95财年的海军造船厂(NSY)综合工时费率进行了比较。NSY工时费率的范围从最高的661.80美元到最低的408.83美元,平均为513.35美元。比较的是与工作水平相关的成本,而没有针对不同的生产率或效率进行调整。为了使SIMA和NSY的工作日率直接可比,需要与DoD FMR有所偏差并调整NSY的工作日率。论文还表明,与SIMA运营相关的大部分成本是固定的; 116,288,974美元的总运营成本中的76,324,797美元为固定成本。在确定为可变成本的39,964,177美元中,36,255,321美元是不可避免的成本,即海军完成必要的维修或保养所需的材料和服务成本,无论在何处进行工作。经营SIMA的固定成本性质有助于提高工时率。使用每小时人工成本进行生产计算得出的工时率为572.15美元,确定的14,922,797美元为维持固定生产劳动力的成本。将每小时的人工成本用于支持工作应该可以进一步减少工时率。

著录项

  • 作者

    Gunderson David W.;

  • 作者单位
  • 年度 1996
  • 总页数
  • 原文格式 PDF
  • 正文语种 en_US
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号