Sequencing activities in a project network using resource complementarity model

机译:使用资源互补模型对项目网络中的活动进行排序

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

The methodology of project management has been widespread in organizations of different functions and sizes. In this context, we address the issue of optimal resource allocation, and more specifically, the analysis of complementarity of resources (primary resource and supportive resource) in a project. We develop a conceptual system capable of determining the ideal timing, and the ideal mixture of resources allocated to the activities of a project, such that the project is completed on time, if not earlier, with minimal cost. In this paper we present new computational results of a Genetic Algorithm, based in a random keys alphabet to optimize the process to reach better results.
机译:项目管理的方法已在具有不同职能和规模的组织中广泛使用。在这种情况下,我们解决最佳资源分配问题,更具体地说,是解决项目中资源(主要资源和支持性资源)的互补性问题。我们开发了一个概念系统,该系统能够确定理想的时间安排以及分配给项目活动的理想资源组合,从而使项目按时完成(即使不是更早),并且成本最低。在本文中,我们基于随机密钥字母提出了遗传算法的新计算结果,以优化过程以达到更好的结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号