摘要

In Canada, there are six major oil pipeline projects either proposed or approved with an in-service date before 2020. The federal government has a regulatory process to evaluate the environmental, economic, and social impacts of proposed pipeline projects. This dissertation examines existing methods that project applicants use to evaluate pipeline impacts in the review process and recommends how current methodologies could be improved. The study uses the Northern Gateway Project as a case study. Decision-makers reviewing proposed pipeline projects must determine whether projects satisfy legislative criteria under the National Energy Board Act and the Canadian Environmental Assessment Act in order to approve the application. Therefore an evaluative framework is necessary to assess the degree to which information in a regulatory application satisfies legislative criteria. A framework consisting of three criteria, namely significant effects, project need, and public interest, is developed. The evaluation determines that there are many major weaknesses in the regulatory application for the Northern Gateway Project concerning the quality of information, which suggests that decision-makers do not have the best available information to adequately assess the project as required under the National Energy Board Act and the Canadian Environmental Assessment Act. A multiple account benefit-cost analysis of the Northern Gateway Project is undertaken to evaluate the capability of the method to provide decision-makers with requisite information to address legislative criteria. The analysis concludes that the Northern Gateway Project represents a net cost to society. The evaluation of multiple account benefit-cost analysis with legislative criteria for project approval under the National Energy Board Act and the Canadian Environmental Assessment Act suggests that the method is suitable for evaluating major pipeline projects and is certainly an improvement relative to existing methods in the federal review process. There are six recommendations to improve the current approach to evaluating project impacts in the federal review process. Recommendations include requiring multiple account benefit-cost analysis in the regulatory application, developing explicit methodological guidelines for applicants, appointing independent experts to prepare impact assessments, developing specific decision-making criteria, evaluating alternative pipeline projects jointly, and improving stakeholder participation in the decision-making process.
机译:在加拿大,有六个主要的石油管道项目被提议或批准,并在2020年之前投入使用。联邦政府制定了监管程序,以评估拟议中的管道项目对环境,经济和社会的影响。本文研究了项目申请人在评估过程中用于评估管道影响的现有方法,并提出了如何改进当前方法的建议。该研究以北方门户项目为案例研究。审查拟议中的管道项目的决策者必须根据《国家能源委员会法》和《加拿大环境评估法》确定项目是否满足立法标准,以批准该申请。因此,有必要建立一个评估框架来评估法规申请中的信息满足立法标准的程度。建立了由三个标准组成的框架,即显着效果,项目需求和公共利益。评估确定,北部门户项目的监管应用在信息质量方面存在许多主要弱点,这表明决策者没有最佳的可用信息来根据《国家能源委员会法》的要求对项目进行充分评估。以及《加拿大环境评估法》。对北部门户项目进行了多帐户收益成本分析,以评估该方法为决策者提供必要信息以解决立法标准的能力。分析得出的结论是,北部门户项目对社会构成了净成本。根据《国家能源委员会法》和《加拿大环境评估法》的立法标准对多账户收益成本分析进行评估,表明该方法适用于评估大型管道项目,并且相对于联邦中的现有方法而言,无疑是一种改进审核过程。有六项建议可以改善当前评估联邦审查流程中项目影响的方法。建议包括要求在监管申请中进行多帐户收益成本分析,为申请人制定明确的方法指南,任命独立专家来准备影响评估,制定特定的决策标准,共同评估替代项目计划以及提高利益相关者对决策的参与。制作过程。

著录项

  • 作者

    Broadbent Sean;

  • 作者单位
  • 年度 2014
  • 总页数
  • 原文格式 PDF
  • 正文语种
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号