首页> 外文OA文献 >In-river backwards run reconstruction of Fraser River sockeye fisheries from 2002 - 2009 and initial validation of the Fraser River Salmon Management Model (FRSMM)
【2h】

In-river backwards run reconstruction of Fraser River sockeye fisheries from 2002 - 2009 and initial validation of the Fraser River Salmon Management Model (FRSMM)

机译:2002-2009年弗雷泽河红鲑渔业的河内向后运行改造以及弗雷泽河鲑鱼管理模型(FRSMM)的初步验证

摘要

Management of Fraser River sockeye is becoming increasingly complicated due to environmental and fishery change. To assist managers I develop an in-river backwards run reconstruction to provide Conservation Unit (CU) specific harvest rates and arrival abundance at Steveston from 2002 – 2009. Annual total harvest rates vary from a low of 4.5% (2009) to a high of 34.7% (2004), while CU specific harvest rates vary from a low of 0.1% for Chilliwack (2007) to a high of 45.3% for the Early Summer Shuswap complex (2004). Harvest rates of Cultus Lake sockeye, a population of concern, never exceed 12.9% (2006). I then provide a coarse validation of the Fraser River Salmon Management Model (FRSMM), and find that FRSMM arrival timing at Mission is simulated to within +/- 2.5 days for 90% of CUs at the 50th percentile, while FRSMM harvests can differ by up to +/-30%.
机译:由于环境和渔业的变化,弗雷泽河红袜的管理变得越来越复杂。为了帮助管理人员,我进行了河道内向后重建,以提供保护单位(CU)特定的收成率和2002年至2009年到达史蒂夫斯顿的数量。年总收成率从4.5%(2009)的低值到最高34.7%(2004年),而CU的特定收获率则从Chilliwack的低0.1%(2007年)到初夏的Shuswap复合物的高45.3%(2004年)。备受关注的Cultus Lake sockeye的收获率从未超过12.9%(2006年)。然后,我对弗雷泽河鲑鱼管理模型(FRSMM)进行了粗略的验证,发现对于90%的CU,第50个百分位数,FRSMM到达Mission的时机模拟为+/- 2.5天之内,而FRSMM的收获量可能会有所不同最高+/- 30%。

著录项

相似文献

  • 外文文献
  • 中文文献

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号