The main causes of building defects are errors in the design and the construction phases. These causes related to construction are mainly due to the general lack of control of construction work and represent approximately 75% of the anomalies. In particular, one of the main causes of such anomalies, which end in building defects, is the lack of control over the physical variables of the work environment during the execution of tasks. Therefore, the high percentage of defects detected in buildings that have the root cause in the construction phase could be avoidable with a more accurate and efficient control of the process. The present work proposes a novel integration model based on information and communications technologies for the automation of both construction work and its management at the execution phase, specifically focused on the flat roof construction process. Roofs represent the second area where more defects are claimed. The proposed model is based on a Web system, supported by a service oriented architecture, for the integral management of tasks through the Last Planner System methodology, but incorporating the management of task restrictions from the physical environment variables by designing specific sensing systems. Likewise, all workers are integrated into the management process by Internet-of-Things solutions that guide them throughout the execution process in a non-intrusive and transparent way.
机译:建筑缺陷的主要原因是设计和施工阶段的错误。与施工有关的这些原因主要是由于普遍缺乏对施工工作的控制,约占异常的75%。尤其是,导致异常的主要原因之一(最终导致建筑缺陷)是在执行任务期间无法控制工作环境的物理变量。因此,通过对过程进行更精确和有效的控制,可以避免在建筑物中根本原因是建筑物中检测到的缺陷百分比很高。本工作提出了一种基于信息和通信技术的新颖集成模型,用于在执行阶段自动进行施工工作及其管理,特别是针对平屋顶施工过程。屋顶代表了声称有更多缺陷的第二个区域。提出的模型基于Web系统,并由面向服务的体系结构支持,用于通过Last Planner System方法进行任务的整体管理,但通过设计特定的传感系统,结合了对来自物理环境变量的任务限制的管理。同样,物联网解决方案将所有工作人员都集成到管理流程中,以非侵入性和透明的方式指导他们整个执行过程。