Studi Penerapan Metode Island Operation sebagai Defence Scheme pada Gardu Induk Teluk Lembu

机译:岛操作法作为防御方案在直落伦布变电站中的应用研究

摘要

Sumatra island has 3 interconnecting transmission lines of 150 kV are in the North Sumatra, Sumatra central and southern Sumatra. Teluk Lembu substation is a substation that is connected to the 150 kV Interconnection System Central Sumatra.Blackout is a disruption of the 150 kV transmission system which caused a total blackout. In order to overcome such interference, when the blackout substation Teluk Lembu can secede from the 150 kV interconnection system (Island Operation). Where Power-generator which is connected to the Teluk Lembu substation only supply power to Teluk Lembu substations.
机译:苏门答腊岛在苏门答腊北部,苏门答腊中部和苏门答腊南部有3条150 kV的互连输电线路。 Teluk Lembu变电站是与150 kV互连系统苏门答腊中央连接的变电站。停电是150 kV输电系统的中断,导致总停电。为了克服这种干扰,当停电变电站Teluk Lembu可以脱离150 kV互连系统时(Island Operation)。连接到Teluk Lembu变电站的发电机仅向Teluk Lembu变电站供电。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号