Analisis Percepatan Pekerjaan Fondasi dan Struktur pada Proyek Konstruksi Pembangkit Listrik Tenaga Uap (PLTU) Tembilahan Propinsi Riau

机译:Tembilahan蒸汽电厂建设项目中基础和结构工作的加速分析

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。
获取外文期刊封面目录资料

摘要

The implementation of construction projects often mismatch between the planning schedule and the realization at site like Coal Fired Steam Power Plant Project (PLTU) in Tembilahan has been delayed during construction.. Considering the increasing need of electric energy significantly in electricity system in Indragiri Hilir, therefore the construction of Coal Fired Steam Power Plant Project in Tembilahan must be finished soon. Overall progress (consists of Engineering Procurement Construction) till July 2015 had already reached 65%. In the item of civil construction work until this August 2015 is about 48% so that effort in accelerating the work implementation should be made soon to pursue a delay that until now still have deviation. The acceleration of implementation work was done by some simulations, like in simulation 1 there is no additional workers, simmulation 2 is additional overtime hours, simulation 3 is additional workers and equipment, and also there is additional overtime hours as many as the number of workers and equipments in simulation 4. The analysis is focused on foundation work and the structure of the building/area in which the material already available there and should be installed (erection) because their work is a critical path and directly impact on steam power plant system. From the analysis, it obtained the optimum cost and time that the simulation of 3 get the optimum cost as much as Rp6.377.772.000 and cost performance index (CPI) as much as 0,98 and simulation 4 get optimum time of 183 days and schedule performance index (SPI) of 1,01.
机译:建设项目的执行通常与计划进度与现场实现不匹配,例如在建造期间推迟了Tembilahan的燃煤蒸汽电厂项目(PLTU)。。考虑到Indragiri Hilir的电力系统中对电能的大量需求,因此,必须尽快完成在滕比拉罕的燃煤蒸汽发电厂项目的建设。到2015年7月的总体进度(包括工程采购建设)已达到65%。截止到2015年8月,在土建工程中,大约48%的工程用于加快工程实施,以延误直到现在仍存在偏差。通过一些模拟来加速实施工作,例如在模拟1中,没有额外的工人,模拟2是额外的加班时间,模拟3是额外的工人和设备,并且额外的加班时间与工人数量一样多模拟中的设备和设备4.分析的重点是基础工作和建筑物/区域的结构,在该建筑物/区域中已经可用并应安装(竖立)的材料,因为它们的工作是关键路径,并且直接影响蒸汽发电厂系统。通过分析,获得了最佳成本和时间,模拟3获得的最佳成本高达Rp6.377.772.000,而成本绩效指数(CPI)则高达0.98,模拟4获得的最佳时间为183天进度绩效指数(SPI)为1,01。