首页> 外文OA文献 >Kapasitas Daya Pembangkit Listrik Tenaga Mikrohidro di Alue Dua Aceh Utara
【2h】

Kapasitas Daya Pembangkit Listrik Tenaga Mikrohidro di Alue Dua Aceh Utara

机译:亚齐省阿鲁杜阿的微水电发电容量

摘要

The utilization of micro hydropower plant is intended for providing electricity at Alue Dua village in North Aceh. A problem associated with the implementation of the micro-hydropower plant in the village is that the water flowrate of the run-of-river is varied at 117 litres per second during the wet season and at 36 litres per second during the dry season. This variation affects the speed of the water turbine and the capacity of power generated by its generator. Therefore to stabilize the output power and voltage of the generator during the course of the year, this paper aims to regulate the intake water flowing into the water turbine by controlling the opening vent valve from 0% up to 100% and controlling the electrical load connected to the generator. The speed of the water turbine was measured using the tachometer. It was found that the generator can produce electricity at its rated power 40 kVA during the wet season by opening the valve at 100% and at 12 kVA with the opening valve at 30% during the dry season. Opening the vent valve at 100% during the dry season can drain the water within 12 minutes
机译:微型水力发电厂的利用旨在为北亚齐省的Alue Dua村供电。与该村中的微型水力发电厂相关的问题是,在雨季,流道的水流量变化为每秒117升,而在旱季则变化为每秒36升。这种变化会影响水轮机的速度和发电机的发电能力。因此,为了在一年中稳定发电机的输出功率和电压,本文旨在通过将打开的排气阀控制在0%至100%并控制所连接的电负载来调节流入水轮机的进水到发电机。使用转速计测量水轮机的速度。人们发现,在雨季期间,通过以100%的比例打开阀门,在干旱季节以30%的比例打开阀门,发电机可以以其40 kVA的额定功率发电。在干旱季节以100%打开排气阀可以在12分钟内将水排干

著录项

  • 作者

    asri, Asri;

  • 作者单位
  • 年度 2014
  • 总页数
  • 原文格式 PDF
  • 正文语种 ID
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号