首页> 外文OA文献 >Analisis Efektivitas Mesin Reng dengan Menggunakan Metode Overall Equipment Effectiveness (Oee) dan Fault Tree Analysis (Fta) di CV. Ali Griya, Semarang
【2h】

Analisis Efektivitas Mesin Reng dengan Menggunakan Metode Overall Equipment Effectiveness (Oee) dan Fault Tree Analysis (Fta) di CV. Ali Griya, Semarang

机译:使用CV中的整体设备效率(Oee)和故障树分析(Fta)方法分析冷气机效率。三宝垄阿里·格里亚(Ali Griya)

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

The analysis of reng machine effectiveness by using Overall Equipment Effectiveness (OEE) and Fault Tree Analysis (FTA) method in CV. Ali Griya, Semarang. The reng machine of CV. Ali Griya, which is used to produce lightweight steel roof with a kind V reng, has not fully worked effectively. This is indicated by the presence of downtime, speed losses, and produce products that are not according to standards that have been determined. This study aims to measure and determine the level of effectiveness of reng machine using Overall Equipment Effectiveness (OEE) method, identify factors that cause six big losses by using Fault Tree Analysis (FTA), and proposes improvements to increase the effectiveness of the machine. From the research, OEE of reng machine reached an average of 57.55%, and still was below the ideal OEE (85%). Proposed improvements that recommended include the elimination of six big losses, develop a maintenance program, and provide training to improve the ability of maintenance and operations.
机译:通过在CV中使用总体设备效率(OEE)和故障树分析(FTA)方法来分析采矿机械的效率。三宝垄阿里·格里亚(Ali Griya)。简历的reng机。阿里·格里亚(Ali Griya)用于生产具有V字样的轻质钢屋顶,但尚未充分有效地发挥作用。这表明存在停机时间,速度损失以及生产的产品不符合已确定的标准的情况。这项研究旨在使用整体设备效率(OEE)方法来测量和确定挖土机的效率水平,使用故障树分析(FTA)识别造成六大损失的因素,并提出改进措施以提高机器的效率。根据研究,re机的OEE平均达到57.55%,但仍低于理想的OEE(85%)。建议的建议改进措施包括消除六大损失,制定维护计划并提供培训以提高维护和操作能力。

著录项

相似文献

  • 外文文献

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号