Studi Perencanaan Pemasangan Genset Emergency pada Gedung C Fakultas Teknik Universitas Riau

机译:廖内大学工程学院C楼应急发电机组安装计划研究

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

Pekanbaru often get a power outage from PLN. It is make disruption of activities and learning process at building C of the Faculty of Engineering University of Riau. At building C of the Faculty of Engineering University of Riau supply of electricity from PLN and genset. Genset installed in the building currently only supplies the third floor of the building. So if the energy supply of PLN is dead then the second floor and the first floor does not get supply of electrical power from the genset.This study discussed about the needs and USAge scheme automatically loads. Analysis of load USAge based on need. Results of analysis are used to determine the priority use of the power generator. From the simulation results ETAP 12.6 are that the emergency power requirement of first priority is 12.8 A, second priority is 1.7 A, third priority is 1.5 A, fourth priority is 1.7 A, fifth priority is 1.7 A, sixth priority is 1.9 A, seventh priority is 1.9 A, eighth priority is 5.6 A. The user schema automatically load was simulated using Proteus 8 professional.
机译:北干巴鲁经常会从PLN停电。它是廖内工程大学学院C楼活动和学习过程的中断。在廖内大学工程学院的C楼,由PLN和发电机组供电。安装在建筑物中的发电机组目前仅供应建筑物的三层。因此,如果PLN的能源供应中断,那么第二层和第一层将无法从发电机组获得电力供应。本研究讨论了需求,USAge方案会自动加载。根据需要分析负荷USAge。分析结果用于确定发电机的优先使用。根据ETAP 12.6的仿真结果,第一优先级的紧急电源需求为12.8 A,第二优先级为1.7 A,第三优先级为1.5 A,第四优先级为1.7 A,第五优先级为1.7 A,第六优先级为1.9 A,第七优先级是1.9 A,第八个优先级是5.6A。自动加载的用户架构是使用Proteus 8 Professional模拟的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号