首页> 外文OA文献 >Analisis Penerapan Kebijakan Total Productive Maintenance pada Proses Produksi Transformer (Studi Kasus : PT. Nikkatsu Electric Works)
【2h】

Analisis Penerapan Kebijakan Total Productive Maintenance pada Proses Produksi Transformer (Studi Kasus : PT. Nikkatsu Electric Works)

机译:全面生产维护策略在变压器生产过程中的应用分析(案例研究:PT。Nikkatsu Electric Works)

摘要

PT. Nikkatsu Electric Works is a company of manufactures that the product is an electrical equipment and energy saving lamps. At the company there is no exact methode to measure the effectiveness of the machines on the production process of transformers, it\u27s make the production process not optimal and impact on not achieving the target production company and need to identify the factors that influence the effectiveness of the machine and analysis of maintenance activities that can be input to the implementation of the Total Productive Maintenance (TPM) for the company. The purpose of this research to measure the level of effectiveness of the total equipment in the production process of transformers, determine factors which is causing the value of Overall Equipment Effectiveness (OEE) is low by identifying damages / losses that occur and give proposed improvement for the implementation of TPM. The result calculation of Overall Equipment Effectiveness ( OEE ) for winding machine period July 2012 - June 2013 had a value of Overall Equipment Effectiveness ( OEE ) ranged from ,80% - 81,19% that is where the value is still below the standard value of Overall Equipment Effectiveness ( OEE ) world class 85 % and the six big losses calculation results obtained : reduced speed loss 42,50%, breakdown loss 21,90%, setup and adjustment 20,20%, quality defect loss 8,67%, idle and minor stoppage loss 6,73%. With calculating the effectiveness of the equipment using the Total Productive Maintenance ( TPM ) which is the calculation formula is Overall Equipment Effectiveness ( OEE ) the company will know if the machine has working effectively or not with Total Productive Maintenance ( TPM ) and be expectedy to increase the effectiveness of equipment that can eliminate large losses for the company, that called as Six Big losses , so it\u27s make getting closer to the main goal of TPM that is zero breakdown .
机译:PT。 Nikkatsu Electric Works是一家制造商,其产品为电气设备和节能灯。在公司中,没有精确的方法来衡量机器在变压器生产过程中的有效性,这会使生产过程不理想并且对未达到目标生产公司的影响,因此需要确定影响有效性的因素机器和维护活动的分析,可以输入到公司的全面生产维护(TPM)的实施中。本研究旨在测量变压器生产过程中整个设备的有效性水平,通过识别已发生的损坏/损失并确定建议的改进措施,确定导致总体设备有效性(OEE)值较低的因素。 TPM的实施。在2012年7月至2013年6月期间,绕线机的总体设备效率(OEE)的结果计算得出的总体设备效率(OEE)的值介于,80%-81,19%之间,该值仍低于标准值总体设备效率(OEE)的世界一流水平的85%,获得的六项重大损失的计算结果:降低的速度损失42,50%,故障损失21,90%,设置和调整20,20%,质量缺陷损失8,67% ,怠速和轻微停机损失6,73%。使用总生产维护(TPM)计算设备的有效性时,其计算公式为总体设备有效性(OEE),公司将知道机器在总生产维护(TPM)下是否有效工作,并期望提高可以消除公司巨额亏损(称为“六大亏损”)的设备的效率,从而使它更接近TPM的主要目标,即零故障。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号