Penerapan Metode dan Teknologi Pre-cast Kolom dan Balok Tricon 3 Jupiter pada Konstruksi Bangunan Gedung Bertingkat

机译:木星的Tricon 3柱和梁预制方法和技术在多层建筑中的应用

摘要

Infrastructure building rusunawa plays a major role in promoting the development of an area and arrangement of residential areas in a city. The construction technology columns and pre-cast concrete beams is an alternative form of construction structures are evolving at this time the world of construction of high-storey building and others in Indonesia. Tricon system 3 jupiter erection erection begins with a column mounted on the module point that has been determined and for the next column column reinforcement entered on all minimal 40D and bracing is installed at the top end of the column and then do grouting column spacing filled in grouting with grouting equipment. Erection beam made after the column, where the beams rested dikolom approximately 3-5 cm then entered the ring joint totaling 4-6 ring linked to overlap dibendrat cuttings, the next step installation bakesting then carried out joint grouting beam-column joint. For the construction slab rested on beams Tricon 3 jupiter. Methods of execution of work Rusunawa that begins with preparatory work, then proceed with the job of building structures under and job fabrication / production of pre-cast, further work on the ground floor (install components of columns, beams and slabs and then grouting and cast stairs), after it resumed work floor 2 (repeated stages on the ground floor) then the account after grouting while experiencing the drying process is done architectural work on the 1st floor after it was done more work on the 3rd floor of the structure, so sterusnya on the floor next to the work of roof coverings and final finishing work.
机译:基础设施建设rusunawa在促进城市的区域发展和居住区的布局方面发挥着重要作用。建筑技术柱和预制混凝土梁是目前印尼正在发展的高层建筑和其他建筑结构的一种替代形式。 Tricon系统3木星的安装首先将一列安装在已确定的模块点上,然后为下一个列输入所有最小40D的列钢筋,并在该列的顶端安装支撑,然后填充注浆的列间距用灌浆设备灌浆。立柱之后的安装梁在梁上放置约3-5厘米,然后进入环缝,共4-6个环,与重叠的dibendrat切屑相连,下一步安装烘烤,然后进行联合注浆梁-柱连接。对于建筑平板,搁在梁Tricon 3木星上。工作方式Rusunawa首先是准备工作,然后进行建筑结构的工作以及预制件的制造/生产,然后在地下进行进一步的工作(安装柱,梁和平板的组件,然后进行灌浆和恢复到第2层的工作空间(位于地面的重复阶段)之后,在经历干燥过程的灌浆后,在第3层进行了更多的工作之后,在第1层进行了建筑工作,所以在地板上的sterusnya旁边要进行屋顶覆盖物的工作和最后的整理工作。

著录项

  • 作者

    Irianie, Yuslan;

  • 作者单位
  • 年度 2013
  • 总页数
  • 原文格式 PDF
  • 正文语种 ID
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号