首页> 外文OA文献 >Perencanaan Pembangunan Desa Wisata Nongkosawit Kecamatan Gunungpati Kota Semarang
【2h】

Perencanaan Pembangunan Desa Wisata Nongkosawit Kecamatan Gunungpati Kota Semarang

机译:三宝垄市古农巴提区农科萨威旅游村的发展规划

摘要

According to Law No 32 of 2004 (Local Government) and Law No 25 of 2004 (National Development Planning System), regional development planning must be done in a participatory and starting from the bottom (bottom-up planning) that begins from the village. Similarly with The Planning of Development Nongkosawit Tourism Village, which apply the development plans through a bottom-up planning to be a Tourism Village. The research was conducted in the Village/Urban Village the District of Nongkosawit in Gunungpati of Semarang City. The method used is disqualitative-descriptive method. This research aims to: (1) describe the implementation of development planning (bottom-up planning) Nongkosawit Tourism Village, (2) describe the planning phase of the Nongkosawit Tourism Village, (3) determine the supporting and inhibiting factor on the successful implementation of development planning in Nongkosawit Tourism Village.The results showed that: (1) implementation of development planning (bottom-up planning) Nongkosawit Tourism Village produces 7 priority proposal of tourism village in Musrenbang on the Nongkosawit urban village level, and 3 priority proposal of tourism village in Musrenbang on the Gunungpati district level. (2) Some of the implementation phase of development planning of Nongkosawit Tourism Village has not been done which is determined the structure and manpower requirements, assessed feasibility of projects, developed the input project, feasibility studies, and monitoring and evaluation, the rest of the implementation development has been done well. (3) There are 4 factors that determine the successfull of the implementation of development planning in Nongkosawit Tourism Village. Because every factor has elements that support and inhibit the successful of the implementation of development planning Nongkosawit Tourism Village, so every factor is rated as supporting and inhibiting factors.It can be concluded that the implementation of development planning in Nongkosawit Tourism Village running smoothly either in regulatory or technical implementation. However, to get an maximum results the author gives some recommendations, there are: (1) Nongkosawit must have the high commitment and optimism for being a tourism village (2) The role of village government should be maximized (3) Planners should immediately follow up several stages of the implementation of the plan which has not been implemented (4) People need to be given the regular socialization about tourism village.
机译:根据2004年第32号法律(地方政府)和2004年第25号法律(国家发展计划系统),必须以参与性方式进行区域发展计划,并从村庄开始的自下而上(自下而上的计划)开始。与Nongkosawit旅游村发展规划类似,该规划通过自下而上的规划将开发计划应用为旅游村。该研究是在三宝垄市Gunungpati的Nongkosawit区的村庄/城市村庄中进行的。使用的方法是定性描述方法。这项研究的目的是:(1)描述Nongkosawit旅游村的发展规划(自下而上的规划)的实施;(2)描述Nongkosawit旅游村的规划阶段;(3)确定成功实施的支撑和抑制因素。结果表明:(1)实施发展规划(自下而上的规划)Nongkosawit旅游村在Nongkosawit城市村一级制定了Musrenbang旅游村的7个优先建议,而Nongkosawit旅游村提出了3个优先建议。 Gunungpati区一级Musrenbang的旅游村。 (2)农科萨威特旅游村的发展规划的某些实施阶段尚未完成,即确定其结构和人力要求,评估项目的可行性,制定投入项目,可行性研究以及监测和评估,其余的实施开发工作做得很好。 (3)决定农科萨维特旅游村能否成功实施发展规划的因素有四个。由于每个因素都有支持和阻碍农科萨维特旅游村成功实施发展计划的因素,因此,每个因素都被评为支持和抑制因素。法规或技术实施。但是,为了获得最大的结果,作者提出了一些建议,包括:(1)Nongkosawit必须对成为旅游村有很高的承诺和乐观态度(2)应该最大化村政府的作用(3)规划者应立即遵循计划的执行工作有几个阶段尚未执行(4)需要对旅游村进行定期的社会化。

著录项

相似文献

  • 外文文献
  • 中文文献

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号