首页> 外文OA文献 >Newsboy Problem untuk Menyelesaikan Masalah Inventory Proyek New Model
【2h】

Newsboy Problem untuk Menyelesaikan Masalah Inventory Proyek New Model

机译:解决新模型项目库存问题的报童问题

摘要

Product Quality Division is in charge to do testing and verification of motorcycle prior the order for mass production items needed. The testing is prepared by the testing department which sends the list of items needed to the warehouse to be ordered. 20 - 43% of the items needed for testing are delayed which drives thetesting department to directly order the same parts to ensure the testing is conducted on time. Crucial parts are determined through Pareto analysis and Newsboy Problem inventory model is used as the inventory system. Based on the simulation of new model project using the proposed inventory system, up to 88% of the total cost of part loss in each project can be saved.
机译:产品质量部负责在订购所需量产产品之前对摩托车进行测试和验证。测试由测试部门准备,测试部门将所需的物料清单发送到要订购的仓库。测试所需的20-43%的项目被延迟,这促使测试部门直接订购相同的零件,以确保测试能够按时进行。通过帕累托分析确定关键零件,并使用Newsboy问题库存模型作为库存系统。在使用建议的库存系统对新模型项目进行仿真的基础上,每个项目最多可以节省88%的零件损失总成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号