CALCULATION OF OPERATION AND MAINTENANCE COST FOR LARGE AND SMALL SCALE NPP. The generation cost of nuclear power plant consists of three components: investment costs, fuel cost operation and maintenance (O&M) cost. O&M costs in the large scale of NPP is different from small scale NPP. The objective of this study are to calculate the O&M cost of large NPP and small NPP by considering technical and economic parameters from secondary data and other references. This study uses 1343 MWe PWR data for large NPP and 90 MWe PWR for small NPP. The assumptions are 5% escalation level and 90% capacity factor. The methodology for calculation using spreadsheet with scaling methods for each O&M components. The results shows that the O &M cost if calculated in units of million US$/year, the O&M cost of NPP 1343 MWe is US$million 99.21/ year which is more expensive than the O&M cost of NPP 90 Mwe which is only US$million 45.13/ year. But if the cost of O&M 1343 MWe nuclear power plant unit is calculated in units of mills $/kWh, the result shows that the O&M cost is 9.37 mills $/kWh which is less than the 90 MWe NPP which reaches $ 63.70 mills/kWh. The conclusion is lower NPP capacity has higher O&M cost. Different O&M cost is caused by power capacity, capacity factor, the amount of worker on site staff, the annual net generation and the offsite technical support.
展开▼