首页> 外文OA文献 >Model Integrasi Penjadwalan Batch dan Penjadwalan Preventive Maintenance dengan Kriteria Minimisasi Biaya Simpan, Biaya Setup, Biaya Pm, Serta Biaya Rework pada Mesin Stabil
【2h】

Model Integrasi Penjadwalan Batch dan Penjadwalan Preventive Maintenance dengan Kriteria Minimisasi Biaya Simpan, Biaya Setup, Biaya Pm, Serta Biaya Rework pada Mesin Stabil

机译:批量计划和预防性维护计划的集成模型,以最小化稳定机器上的节省成本,设置成本,Pm成本和返工成本的标准

摘要

This study developed a model of batch scheduling involving the unavailability machine to minimize setup costs, cost of preventive maintenance and the cost of rework in a stable machine. This model is considered necessary in order to understand the effect of the unavailability machine for production runs and to understand the effect on the batch production schedule. The results of this study indicate that the first and last run will not give single batch. Given a hypothetical example of how the model and algorithm developed solve the problem instance.
机译:这项研究开发了一种涉及不可用机器的批处理调度模型,以最小化设置成本,预防性维护成本和稳定机器中的返工成本。为了了解不可用机器对生产运行的影响并了解对批生产计划的影响,该模型被认为是必需的。这项研究的结果表明,第一批和最后一批不会给出单批。给出一个有关模型和算法如何解决问题实例的假设示例。

著录项

  • 作者

    Zahedi, Zahedi;

  • 作者单位
  • 年度 2014
  • 总页数
  • 原文格式 PDF
  • 正文语种 ID
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号