Pengendalian Waktu dan Biaya Pekerjaan Konstruksi sebagai Dampak dari Perubahan Desain

机译:设计变更对施工时间和成本的控制

摘要

The purpose of this study is to describe the effect of changing control of the design that have an impact on the time and cost of construction work that affects the performance of construction work Embung Irrigation Oenaem. This study used two methods of controlling the Earned Value Analysis (EVA) and integrated method of shortening the duration of the critical path (Crashing Length) at Critical Path Method (CPM) using the application as an alternative to controlling overtime. To use of the two methods mentioned above it can be seen and obtained alternative pengedalian time and construction costs as a result of design changes that occurred in the Irrigation Development Project Embung Oenaem. Based on the analysis that had been done when a deviation occurs at 7 weeks, the total work period to 37 weeks from 30 weeks the amount of time a plan with estimated cost is Rp. 9,489,206,129.03. Then controlled using the method of shortening the duration (Crashing Length) with future application of the overtime work to 35 weeks (5 weeks delay) with the amount of the cost of Rp. 9.458.239.978,70 (excluding VAT) of the total contract value of Rp. Rp. 8.563.635.912,98 (excluding VAT 10%).
机译:这项研究的目的是描述改变设计控制的效果,这些设计对施工时间和成本的影响会影响Embung Irrigation Oenaem的施工性能。这项研究使用两种方法来控制挣值分析(EVA)和使用关键应用程序(CPM)来缩短关键路径的持续时间(崩溃长度)的综合方法,该应用程序可以替代控制超时的方法。使用上述两种方法,可以看到并获得了灌溉发展项目Embung Oenaem中发生的设计更改的结果,从而产生了可替代的Penalalian时间和施工成本。根据在第7周发生偏差时所做的分析,将总工作时间从30周减少到37周,估计成本的计划时间为Rp。 9,489,206,129.03。然后使用缩短工期(崩溃时长)的方法进行控制,将来加班工作应缩短至35周(延迟5周),而费用为Rp。 Rp的合同总价的9.458.239.978,70(不含增值税)。 Rp。 8.563.635.912,98(不含增值税10%)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号