This Implementation Project had two purposes: 1) to update the INDOT Division of Materials and Tests’ laboratory equipment and train personnel to properly conduct the testing for subgrade resilient modulus in accordance with new AASHTO testing protocol (AASHTO T0294-94(; 2) to educate and train the geotechnical engineering section in the procedures for determining the design resilient modulus with minimum required testing, while using the database of the previous report on this subject, FHWA/IN/JHRP-92/23, “Subgrade Resilient Modulus for Pavement Design and Evaluation,” Part I of the Final Report, the detailed “Laboratory Procedures Manual,” has been written for use by laboratory technicians having no formal engineering background. INDOT Materials and Tests Division personnel have been trained in performing the tests to the satisfaction of supervisory personnel.
展开▼
机译:该实施项目有两个目的:1)更新INDOT材料和测试部门的实验室设备,并培训人员根据新的AASHTO测试协议(AASHTO T0294-94(; 2)正确进行路基弹性模量测试,在使用最低要求的测试来确定设计弹性模量的过程中,对岩土工程部分进行教育和培训,同时使用有关该主题的先前报告的数据库FHWA / IN / JHRP-92 / 23,“用于路面设计的路基弹性模量”最终报告的第一部分,即详细的“实验室程序手册”已经编写,供没有正式工程背景的实验室技术人员使用。INDOT材料和测试部门的人员已经接受了培训,以进行满意的测试。监督人员。
展开▼