首页> 外文OA文献 >The Development of a Speed Monitoring Program for Indiana
【2h】

The Development of a Speed Monitoring Program for Indiana

机译:印第安纳州速度监控程序的开发

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

From the passage of the National Maximum Speed Limit (NMSL) of 55 mph in 1974 through its repeal in 1995 speed monitoring programs have been mandated by the federal government. The speed-monitoring program was primarily intended to provide reliable data to be included as a part of the State’s annual certification in order to be approved for Federal Aid highway projects. The repeal of the NMSL in 1995 not only authorized states to set their own speed limits, it also allowed states to develop their own speed monitoring programs. The goal of this research is to provide the framework for a speed-monitoring program to meet the needs of agencies and organizations that use speed-monitoring data in the State of Indiana. A proposed speed monitoring plan is developed which distributes speed monitoring stations to highway classes according to three primary criteria: spatial distribution, crash distribution, and distribution of daily vehicle miles traveled. The proposed speed-monitoring program will utilize 38 existing speed, weigh-in-motion, and automated traffic recording stations. The stations will be monitored four times a year for a 24-hour period. Furthermore, the proposed program will monitor speeds based on vehicle length. It is the recommendation of this research that Indiana phase in the proposed speed-monitoring plan developed in the present research, during the 1999 calendar year. The implementation should include a visual inspection of all the WIM, ATR, and speed monitoring stations listed in Appendix A to ensure they are still capable of monitoring speeds by vehicle class and travel direction. If any problems should arise with the existing stations, that station should be substituted for another station within that district and highway class.
机译:从1974年通过55 mph的国家最高时速限制(NMSL)到1995年废除速度限制,联邦政府已强制实施速度监控程序。速度监控程序的主要目的是提供可靠的数据,该数据将被包括在该州的年度认证中,以便获得联邦援助高速公路项目的批准。 1995年NMSL的废除不仅授权各州设定自己的速度限制,还允许各州制定自己的速度监控程序。这项研究的目的是为速度监视程序提供框架,以满足使用印第安纳州速度监视数据的机构和组织的需求。制定了拟议的速度监控计划,该计划根据三个主要标准将速度监控站分配到公路等级:空间分配,碰撞分配和每日行进车辆英里数的分配。拟议的速度监控程序将利用38个现有的速度,动态称重和自动交通记录站。每年将对电台进行四次监测,持续24小时。此外,建议的程序将根据车辆长度监控速度。这项研究的建议是,在1999日历年期间,印第安纳州在本研究中提出的拟议速度监测计划中。实施过程应包括对附录A中列出的所有WIM,ATR和速度监测站进行目视检查,以确保它们仍然能够按车辆类别和行驶方向监测速度。如果现有站点出现任何问题,则应将该站点替换为该地区和公路等级内的另一个站点。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号