首页> 外文OA文献 >Computer simulation of mechanised bord and pillar coal production systems
【2h】

Computer simulation of mechanised bord and pillar coal production systems

机译:机械化博德煤和柱煤生产系统的计算机模拟

摘要

With the increased use of computers over the last twenty yearssimulation of many systems encountered in mining operations hasbecome possible. The speed of computer calculations makespossible analysis of both the basic system and variation ofoperating parameters within it.This Thesis firstly looks at what has been done in the past with•respect to simulation of mining and its application to today'smethod of coal*mining. From there it describes Australia'scoal mining practice and certain operations research techniquesthat can be applied to the methods employed. Then an analysisis carried out on the method of mining and the variables that arethought to affect the closed environment under study.A computer simulation program (called COALSIM) is then writtenand used to reproduce an Australian Coal Mining Operation, itsadaptability and validation being examined through case studies.
机译:在过去的二十年中,随着计算机使用的增加,已经有可能模拟采矿作业中遇到的许多系统。计算机的计算速度使得对基本系统及其内部运行参数的变化进行分析成为可能。本文首先着眼于过去在模拟采矿方面所做的工作并将其应用于当今的煤*采矿方法。从那里开始,它描述了澳大利亚的矿山开采实践以及可以应用于所采用方法的某些运筹学技术。然后对采矿方法和影响研究中封闭环境的变量进行了分析。然后编写了一个计算机模拟程序(称为COALSIM),并用于复制澳大利亚煤炭开采业务,并通过案例研究其适应性和有效性学习。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号