首页> 外文OA文献 >Australia's future submarine: shaping early adaptive designs through test and evaluation
【2h】

Australia's future submarine: shaping early adaptive designs through test and evaluation

机译:澳大利亚未来的潜艇:通过测试和评估来塑造早期的自适应设计

摘要

The Australian Government recently announced that France’s Direction des Constructions Navales Services (DCNS) had been selected to design and build Australia’s future submarine, known as the Shortfin Barracuda. Starting in 2016 when an initial design contract is signed, this will be the major developmental Defence project for Australia over the next ten years. This paper reviews the possible developmental approach options that come next for Australia’s future submarine project using the U.S. Defense acquisition life cycles, and finds a preferred approach to be the U.S. acquisition model of Engineering Manufacture Development (EMD), before any production contract. EMD does not align in all regards with Australia’s existing political, military, industrial, technological and economic design processes, which are identified and compared against existing aqcuisition models. The paper also reviews major lessons learned in Australian acquisitions regarding early preview test and evaluation (T&E), which has been the focus of serious reviews by the Senate, Australian National Audit Office (ANAO) and the Department of Defence (DoD) since 2012. Such review includes public testimony by Australia’s DoD in March 2016 to the Joint Parliamentary Committee on Public Accounts and Audit, once again, regarding the absolute limits of paper-based down-selection from contender submissions even when the acquisitions are allegedly mature off-the-shelf acquisitions. The paper recommends that DCNS as the preferred contender work through a detailed series of preview evaluations before an EMD contract is signed. Lessons learned from the Collins Class Submarine and example preview T&E activities are provided to help justify this caution for Australia’s DoD. Such preview T&E would practically and independently confirm for both DCNS and Australia’s DoD exactly what are the major technical and operational risks driving modification of Australia’s submarine from its baseline French design – and do so before they both get locked into contract! The paper distils all these factors into eleven recommended T&E goals for the Shortfin Barracuda design, principally based around early commitment to an estimated five land-based test sites and two in-water test sites. Finally, the paper proposes more broadly that there be greater investment in the social spaces for critical thinking to guide the submarine design towards a continuous evolving design and build rather than blocks of design and build. Modelling of this approach out to 2050 shows an earlier initial capability might be achieved by as much as six to eight years and involve up to forty percent less submarine rework.
机译:澳大利亚政府最近宣布,已选择法国海军建设指挥部(DCNS)设计和建造澳大利亚未来的潜艇,即短鳍梭鱼。从2016年签订初始设计合同开始,这将是未来十年澳大利亚重大的国防发展项目。本文回顾了使用美国国防采购生命周期的澳大利亚未来潜艇项目接下来可能使用的开发方法选项,并找到了一种首选方法,即在签订任何生产合同之前,美国采用工程制造开发(EMD)的采购模式。 EMD并未在所有方面与澳大利亚现有的政治,军事,工业,技术和经济设计流程保持一致,这些流程已被识别并与现有的用水模型进行了比较。本文还回顾了从澳大利亚收购中获得的有关早期预览测试和评估(T&E)的主要经验教训,自从2012年以来,这一直是参议院,澳大利亚国家审计署(ANAO)和国防部(DoD)进行认真审查的重点。此类审查包括澳大利亚国防部于2016年3月再次向公共账目和审计联合议会委员会提供公开证词,内容涉及即使有据称收购已成熟,但从竞争者提交的文件中选择纸质文件的绝对限制。货架收购。本文建议在签署EMD合同之前,通过一系列详细的预览评估,将DCNS作为首选竞争者。提供了从柯林斯级潜水艇获得的经验教训和示例性T&E预览活动,以帮助证明对澳大利亚国防部的这种谨慎态度。这样的预告性T&E实际上并独立地为DCNS和澳大利亚国防部确定了将澳大利亚潜艇从其基准法国设计进行改装的主要技术和操作风险是什么,并且要在它们都锁定合同之前就这样做!本文将所有这些因素分解为Shortfin梭子鱼设计的11个推荐的T&E目标,主要是基于对5个陆基测试地点和2个水下测试地点的早期承诺。最后,本文更广泛地建议对社交空间进行批判性思维方面的更多投资,以指导潜艇设计朝着不断发展的设计和建造,而不是设计和建造的模块发展。到2050年,对这种方法的建模表明,较早的初始能力可能要花6到8年才能实现,并且最多可减少40%的潜艇返工。

著录项

  • 作者

    Joiner KF; Atkinson SR;

  • 作者单位
  • 年度 2016
  • 总页数
  • 原文格式 PDF
  • 正文语种 English
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号