首页> 外文OA文献 >An integrated system to aid the planning of concrete structures: introducing the system
【2h】

An integrated system to aid the planning of concrete structures: introducing the system

机译:有助于混凝土结构规划的集成系统:系统介绍

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

This paper reports on the development at Loughborough University of a CAD-based integ­rated model to aid the planning of in-situ concrete structures. The system development started after a review of the planning models currently available and after a detailed questionnaire survey undertaken amongst the top UK and US contractors on the current status of planning techniques and information technology. The main aim of this system is to automate the planning process of in-situ concrete structures using data generated by CAD systems. So far, the integration of a CAD system (AutoCAD 10) and a computerized scheduling sys­tem (Artemis 2000) has been achieved on a typical IBM-PC. This enables the generation of network plans using AutoCAD which are then automatically transferred lo the Artemis system for time and cost analyses. udTraditionally, construction planners are faced with many conventional drawings and documents which are used lo re-extract information relevant lo their planning processes. Such an approach can be very inefficient as ii involves data double-handling and is often error prone. In addition, current computerized construction planning applications are little more than the automation of manual formulations of plans. For example, data are fed into the planning system and computations are performed using either CPM (Critical Path Method) or PERT (Programme Evaluation and Review Technique). However, data relating lo the planning process such as activity lists, resources requirements and durations are not automatically generated within the system. II would thus seem logical to devise a CAD-based integrated planning model which accepts data in its elec­tronic format and involves some integration of the traditional planning approach. This paper introduces the proposed CAD-based integrated planning model and describes its different components. In addition, it dis­cusses the system functional specifications and summarizes the main benefits and limitations of such a model.
机译:本文报道了拉夫堡大学基于CAD的集成模型的发展,该模型有助于现场混凝土结构的规划。在审查了当前可用的计划模型之后,并在英国和美国顶级承包商对计划技术和信息技术的现状进行了详细的问卷调查之后,开始了系统开发。该系统的主要目的是利用CAD系统生成的数据来自动化现浇混凝土结构的规划过程。到目前为止,已经在典型的IBM-PC上实现了CAD系统(AutoCAD 10)和计算机调度系统(Artemis 2000)的集成。这样就可以使用AutoCAD生成网络计划,然后自动将其传输到Artemis系统中以进行时间和成本分析。 ud传统上,建筑规划师面临着许多传统的图纸和文件,它们被用于重新提取与规划过程有关的信息。这种方法效率极低,因为ii涉及数据双重处理,并且经常容易出错。另外,当前的计算机化施工计划应用仅是手工制定计划的自动化。例如,将数据输入到计划系统中,并使用CPM(关键路径方法)或PERT(程序评估和审查技术)进行计算。但是,与计划过程相关的数据(例如活动列表,资源需求和持续时间)不会在系统内自动生成。因此,II看起来似乎合乎逻辑的是设计一个基于CAD的集成计划模型,该模型以电子格式接收数据并涉及传统计划方法的一些集成。本文介绍了提出的基于CAD的集成计划模型,并描述了其不同的组成部分。另外,它讨论了系统功能规范并总结了这种模型的主要优点和局限性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号