首页> 外文期刊>Procedia Engineering >Behavior of Precast Concrete Beam-to-Column Connection with U- and L-bent Bar Anchorages Placed Outside the Column Panel–experimental Study
【24h】

Behavior of Precast Concrete Beam-to-Column Connection with U- and L-bent Bar Anchorages Placed Outside the Column Panel–experimental Study

机译:

获取原文
获取原文并翻译 | 示例

摘要

An experimental work has been conducted in the laboratory to investigate the behavior of several precast concrete beam-to-column connections prepared to achieve the constructability aspect of structures. The study was performed on interior connection specimens as part of a system of moment-resisting frame, and the emphasis was put on their response behavior to cyclic loading. By observing the deformation of the structure, as was recorded via transducers and strain-gauges attached to it, an overview of the connection's behavior characteristics was obtained. The overall performance of the connection could be determined by comparing its parameters with that of an equal monolithic connection.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号