首页> 外文OA文献 >Quantifying hazard exposure using real-time location data of construction workforce and equipment
【2h】

Quantifying hazard exposure using real-time location data of construction workforce and equipment

机译:使用施工人员和设备的实时位置数据量化危害暴露

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

Traditional risk assessment methods typically evaluate accident probability, exposure frequency or duration, and consequence severity respectively, and finally determine a quantitative risk score or a qualitative risk level. The assessment process is prospective and subjective. Changing and complex construction situations impede their practical and efficient application. To assess safety risk with regard to changing site conditions in an objective and efficient way, this study proposes a quantitative model for hazard exposure assessment based on real-time location data of construction workforce and equipment, collected by a location-based proximity warning system. In contrast with traditional risk assessment methods, the model proposed in this study combines accident probability and hazard exposure duration into a single quantitative concept—hazard exposure amount. This concept takes into account the space factor as well as the time factor of construction activities. For ease of understanding, a hazard is analogized as a radiation source and the hazard exposure is then referred to as the radiation quantity received. The longer duration and closer proximity in which a person is exposed to a radiation (hazard), the more radiation the person receives (the higher risk to which the person is exposed). A trial study is described in which a proximity warning system was developed and used to demonstrate and test the model’s capability of hazard exposure assessment. This shows that the system can provide safety officers with an ongoing and immediate means of comparing safety risk trends from worker, hazard and project perspectives.
机译:传统的风险评估方法通常分别评估事故概率,暴露频率或持续时间以及后果严重性,并最终确定定量风险评分或定性风险水平。评估过程是前瞻性和主观的。不断变化的复杂施工环境阻碍了它们的实际和高效应用。为了客观有效地评估现场条件变化带来的安全风险,本研究提出了一种基于位置的邻近预警系统收集的建筑工人和设备的实时位置数据的危害暴露评估定量模型。与传统的风险评估方法相比,本研究中提出的模型将事故概率和危害暴露持续时间合并为一个定量概念-危害暴露量。该概念考虑了建筑活动的空间因素和时间因素。为了便于理解,将危险类比为辐射源,然后将危险暴露称为接收到的辐射量。一个人暴露在辐射中的持续时间越长且距离越近(危险),则该人受到的辐射就越多(该人面临的风险越高)。描述了一项试验研究,其中开发了一个接近警告系统,并用于演示和测试该模型的危害暴露评估能力。这表明该系统可以为安全人员提供持续,即时的手段,以从工人,危害和项目的角度比较安全风险趋势。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号