首页> 外文OA文献 >Tracking locomotive position to evaluate sugarcane railway schedules and predict arrival time
【2h】

Tracking locomotive position to evaluate sugarcane railway schedules and predict arrival time

机译:跟踪机车位置以评估甘蔗铁路时间表并预测到达时间

摘要

This research utilised software developed for managing the Australian sugar industry's cane rail transport operations and GPS data used to track locomotives to ensure safe operation of the railway system to improve transport operations. As a result, time usage in the sugarcane railway can now be summarised and locomotive arrival time to sidings and mills can be predicted. This information will help the development of more efficient run schedules and enable mill staff and harvesters to better plan their shifts ahead, enabling cost reductions through better use of available time.
机译:这项研究利用为管理澳大利亚制糖业的甘蔗铁路运输运营而开发的软件以及用于跟踪机车的GPS数据,以确保铁路系统的安全运营以改善运输运营。结果,现在可以总结甘蔗铁路中的时间使用情况,并可以预测机车到壁板和轧机的到达时间。这些信息将有助于制定更有效的运行计划,并使工厂员工和收割机能够更好地计划未来的班次,从而通过更好地利用可用时间来降低成本。

著录项

  • 作者

    Kono Alex Rodrigues;

  • 作者单位
  • 年度 2015
  • 总页数
  • 原文格式 PDF
  • 正文语种
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号