首页> 外文OA文献 >Financial evaluation of waste management methods: a case study
【2h】

Financial evaluation of waste management methods: a case study

机译:废物管理方法的财务评估:一个案例研究

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

This paper investigates the relatively new field of waste management in the construction industry, and examines the success of the waste management system implemented by Barclay Mowlem Construction Pty Ltd on the Vantage Apartments project in Brisbane. The study incorporates the assessment of the current on-site waste management operations plan, a financial feasibility providing a comparison between traditional waste disposal methods, waste disposal methods as adopted on this site, and proposed environmental ideal waste management methods. Finally, a statistical analysis to determine waste quantities generated and the success of the current methods implemented.ududA best comparison is made between traditional waste handling methods, the system used on the Vantage Apartments project and an idealised system of total waste management. Results indicated the total cost of waste handling and disposal for the Vantage Apartments project was approximately the same as for traditional methods. For the idealised system of total waste management, there was an increase of cost of 66% over the traditional method.ududThe success of waste separation on the Vantage Apartments project was not realised to its fullest potential. This result is partially attributable to difficult site conditions and the subcontractor’s unfamiliarity with a Waste Management Scheme. It is anticipated that improvement in these areas would require better control and planning of waste handling. Although it is obviously environmentally beneficial to increase efforts in waste separation and recycling it must be considered that costs do increase substantially should tighter on-site controls be implemented, and that if the recycling opportunities are not readily available, there is little potential for any substantial financial or environmental gains.
机译:本文研究了建筑行业中相对较新的废物管理领域,并考察了Barclay Mowlem Construction Pty Ltd在布里斯班Vantage Apartments项目上实施的废物管理系统的成功。这项研究包括对当前现场废物管理操作计划的评估,财务可行性,以比较传统废物处理方法,该站点采用的废物处理方法和建议的环境理想废物管理方法。最后,进行统计分析以确定产生的废物数量以及当前实施方法的成功。 ud ud在传统废物处理方法,Vantage Apartments项目所使用的系统和理想的总废物管理系统之间进行了最佳比较。结果表明Vantage Apartments项目的废物处理和处置总成本与传统方法大致相同。对于理想的总废物管理系统,其成本比传统方法增加了66%。 ud udVantage Apartments项目的废物分离成功并未得到最大发挥。该结果部分归因于困难的现场条件以及分包商对废物管理计划的不熟悉。可以预见,要改善这些领域,就需要更好地控制和规划废物处理。尽管加大废物分类和回收的工作对环境显然是有益的,但必须考虑到,如果实施更严格的现场控制,成本确实会大幅增加,并且如果回收机会不易获得,那么任何实质性的可能性都很小。经济或环境收益。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号