首页> 外文OA文献 >Procuring OSM : base-line models of off-site manufacture business processes in Australia
【2h】

Procuring OSM : base-line models of off-site manufacture business processes in Australia

机译:采购OSM:澳大利亚异地制造业务流程的基线模型

摘要

A pressing cost issue facing construction is the procurement of off-site pre-manufactured assemblies. In order to encourage Australian adoption of off-site manufacture (OSM), a new approach to underlying processes is required. The advent of object oriented digital models for construction design assumes intelligent use of data. However, the construction production system relies on traditional methods and data sources and is expected to benefit from the application of well-established business process management techniques. The integration of the old and new data sources allows for the development of business process models which, by capturing typical construction processes involving OSM, provides insights into such processes. This integrative approach is the foundation of research into the use of OSM to increase construction productivity in Australia. The purpose of this study is to develop business process models capturing the procurement, resources and information flow of construction projects. For each stage of the construction value chain, a number of sub-processes are identified. Business Process Modelling Notation (BPMN), a mainstream business process modelling standard, is used to create base-line generic construction process models. These models identify OSM decision-making points that could provide cost reductions in procurement workflow and management systems. This paper reports on phase one of an on-going research aiming to develop a proto-type workflow application that can provide semi-automated support to construction processes involving OSM and assist in decision-making in the adoption of OSM thus contributing to a sustainable built environment.
机译:施工面临的紧迫成本问题是现场外预制组件的采购。为了鼓励澳大利亚采用异地制造(OSM),需要一种新的基础流程方法。面向对象的数字模型在建筑设计中的出现假定了数据的智能使用。但是,建筑生产系统依赖于传统的方法和数据源,并有望从成熟的业务流程管理技术的应用中受益。新旧数据源的集成允许开发业务流程模型,该业务流程模型通过捕获涉及OSM的典型构造流程,可以洞悉此类流程。这种综合方法是研究使用OSM来提高澳大利亚建筑生产率的基础。这项研究的目的是开发业务流程模型,以捕获建设项目的采购,资源和信息流。对于建筑价值链的每个阶段,都会确定许多子过程。业务流程建模表示法(BPMN)是一种主流的业务流程建模标准,用于创建基线通用构造流程模型。这些模型确定了OSM决策点,可以降低采购工作流程和管理系统的成本。本文报告了正在进行的研究的第一阶段,该研究旨在开发一种原型工作流应用程序,该应用程序可以为涉及OSM的施工过程提供半自动支持,并协助采用OSM的决策制定,从而为可持续的建筑业做出贡献环境。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号