首页> 外文OA文献 >A new Nawaz–Enscore–Ham-based heuristic for permutation flow-shop problem with bicriteria of makespan and machine idle-time
【2h】

A new Nawaz–Enscore–Ham-based heuristic for permutation flow-shop problem with bicriteria of makespan and machine idle-time

机译:一种新的基于Nawaz–Enscore–Ham的启发式方法,用于置换流水车间问题,并包含makepan和机器空闲时间的标准

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

A new heuristic based on Nawaz–Enscore–Ham (NEH) algorithm is proposed for solving permutation flowshop scheduling problem in this paper. A new priority rule is proposed by accounting for the average, mean absolute deviation, skewness and kurtosis, in order to fully describe the distribution style of processing times. A new tie-breaking rule is also introduced for achieving effective job insertion for the objective of minimizing both makespan and machine idle-time. Statistical tests illustrate better solution quality of the proposed algorithm, comparing to existing benchmark heuristics.
机译:提出了一种基于Nawaz–Enscore–Ham(NEH)算法的启发式算法,用于解决置换流水车间调度问题。通过考虑平均值,平均绝对偏差,偏度和峰度,提出了一种新的优先级规则,以充分描述加工时间的分布方式。还引入了一条新的打破平局规则,以实现有效的作业插入,以最小化制造时间和机器闲置时间。统计测试表明,与现有的基准启发式算法相比,该算法的解决方案质量更好。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号