首页> 外文OA文献 >Optimal generation scheduling of interconnected wind-coal intensive power systems
【2h】

Optimal generation scheduling of interconnected wind-coal intensive power systems

机译:互联风煤密集型电力系统的最优发电调度

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

Large scale wind power generation complicated with restrictions on the tie line plans may lead to significant wind power curtailment and deep cycling of coal units during the valley load periods. This study proposes a dispatch strategy for interconnected wind-coal intensive power systems (WCISs). Wind power curtailment and cycling of coal units are included in the economic dispatch analysis of regional systems. Based on the day-ahead dispatch results, a tie line power plan adjustment strategy is implemented in the event of wind power curtailment or deep cycling occurring in the economic dispatch model, with the objective of reducing such effects. The dispatch strategy is designed based on the distinctive operation characteristics of interconnected WCISs, and dispatch results for regional systems in China show that the proposed strategy is feasible and can improve the overall system operation performance.
机译:大规模的风力发电,加上对联络线计划的限制,可能会导致严重的风力发电缩减,并在谷底负荷期间导致煤机深度循环。这项研究提出了一种针对互联风煤密集型电力系统(WCIS)的调度策略。区域系统的经济调度分析中包括了限制风力发电和燃煤机组的循环。基于提前调度结果,在经济调度模型中发生风电削减或深度循环的情况下,实施联络线电力计划调整策略,目的是减少这种影响。根据互连的WCIS的独特运行特征设计了调度策略,并且针对中国区域系统的调度结果表明,该策略是可行的,可以改善整个系统的运行性能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号