首页> 外文OA文献 >A support tool for assessing the risks of heavy lift vessel logistics in the installation of offshore wind farms
【2h】

A support tool for assessing the risks of heavy lift vessel logistics in the installation of offshore wind farms

机译:用于评估海上风电场安装中重型起重船物流风险的支持工具

摘要

Semi-submersible heavy lift vessels (HLVs) are currently the main option for the installation of electrical substation platforms on offshore wind farms. As sites move further offshore installation operations are subject to harsher weather conditions which results in increased uncertainty over the cost and duration of the installation. Assessing the comparative risks associated with logistical decisions and identifying the best course of action is therefore a challenging problem. This study describes a support tool developed through collaboration between industry and academia which is designed to aid decision makers by providing improved understanding of the risks associated with logistical decisions. A case study of a realistic offshore wind farm installation is utilised to explore the impact of key HLV logistical decisions on the cost and duration of the installation of offshore substations.
机译:目前,半潜式重型起重船(HLV)是在海上风电场上安装变电站平台的主要选择。随着现场的进一步移动,海上安装操作会遇到更恶劣的天气条件,这导致安装成本和持续时间的不确定性增加。因此,评估与后勤决策相关的比较风险并确定最佳行动方案是一个具有挑战性的问题。这项研究描述了一种通过行业和学术界合作开发的支持工具,旨在通过更好地了解与物流决策相关的风险来帮助决策者。利用一个现实的海上风电场安装案例研究来探索关键的HLV后勤决策对海上变电站安装成本和持续时间的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号