This presentation investigates possible directions for identifying the best ways to operate voltage constrained 11kV network with large penetration of DGs. The work is produced as part of the SP Energy Networks (SPEN) Accelerating Renewable Connections (ARC) project which investigates different options to accelerate the connection of renewable DG capacity.
展开▼