首页> 外文OA文献 >Mine surveillance measurements during the building of NOP II shaft
【2h】

Mine surveillance measurements during the building of NOP II shaft

机译:建造NOP II竖井期间的矿山监视测量

摘要

The Velenje Coal Mine is building a new shaft NOP II for the udtransportation of coal from the mine. The entrance of the shaft, udwhich is determined on the surface, and the bottom of the udshaft, which is expected in the point determined at the bottom udof the shaft, must be within the same vertical and horizontal udcoordinate system. The starting points for the measurements udare the points determined on the surface, which are stable udor have a determined direction and velocity. The transfer of udthe coordinate system from the surface into the shaft can be udcarried out with the measurements using various methods. udThe results of the measurements and the calculations are the udcoordinate points in the shaft that are in the same coordinate udsystem as those on the surface. They are very suitable for the uddetermination of the designed NOP II shaft. At the beginning udof this task, we planned to determine the coordinates of the udstarting points with a maximum precision. Based on the udresults of an analysis, we can conclude that we performed udeach phase of the work very well and achieved the tasks set.
机译:Velenje煤矿正在建造新的NOP II竖井,用于从矿井运煤。在表面上确定的轴输入 ud和在轴的底部 ud确定的点中预期的 udshaft的底部必须在相同的垂直和水平 ud坐标系内。测量的起点在表面上确定的,稳定的点具有确定的方向和速度。坐标系从曲面到轴的传递可以通过使用各种方法进行测量来实现。 ud测量和计算的结果是轴中的 ud坐标点,其坐标与表面上的坐标 udsystem相同。它们非常适合确定NOP II轴的确定。在此任务的开始 ud,我们计划以最大的精度确定 udstart点的坐标。根据分析的结果,我们可以得出结论,我们很好地完成了每个阶段的工作,并完成了设定的任务。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号