首页> 外文OA文献 >Geodetic works during construction of hydroelectric power stations on lower Sava
【2h】

Geodetic works during construction of hydroelectric power stations on lower Sava

机译:下萨瓦河水电站建设期间的大地测量工作

摘要

Slovenia is among the water-richest countries in Europe. Through our territory runns quite a few rivers on which we have successfully built a hydroelectric power plants to generate electricity. Already in the 80 - s, our experts were increasingly concerned by the increase in renewable electricity in that way. River Sava was preferred in the lower reaches, flowing through Brežice to Croatia. It was suggested to build hydro chain, which includes construction of hydroelectric power plants: Boštanj, Blanca, Brežice and Mokrice. The first two are already built and in operation, the last in the chain is expected at the end of 2015.udThis graduation thesis focuses on laws that are essentials for the construction of hydroelectric power plant and are strongly associated with the surveying profession (the geodetic construction plan for the design, surveying network, control measurements and registration in official records). The content of regulations and laws, is logically related to the building hydroelectric power plant Blanca. Surveyors have been through the entire process of building an indispensable part, without which the construction was not possible. udSurveyor is the first presence on the ground and draw a surveying plan, which helps the designer on the project. Later, his duties have increased and include: regular transfers from the project into the nature, control measurements of compliance of construction with the project, calculations of transported volumes of material, monitoring and recording changes that occured during construction, and construction of surveying and mapping plan for the registration in official records.ud
机译:斯洛文尼亚是欧洲最富水的国家之一。穿越我们的领土,有多条河流,我们已经在这些河流上成功地建造了水力发电厂来发电。早在80年代,我们的专家就越来越关注以这种方式增加可再生电力。萨瓦河在下游较为可取,它通过布雷日采流向克罗地亚。建议建设水力链,包括建设水力发电厂:Boštanj,Blanca,Brežice和Mokrice。前两个已经建造并投入运营,最后一个有望在2015年底投入使用。 ud本毕业论文的重点是建设水力发电厂必不可少的法律,并且与测量专业紧密相关(大地测量施工计划,用于设计,测量网络,控制测量和正式记录中的注册)。法规和法律的内容在逻辑上与建筑物Blanca的水力发电厂有关。验船师已经完成了建造必不可少的部分的整个过程,否则就无法建造。 udSurveyor是第一个出现在地面并制定测量计划的计划,可帮助设计师进行项目。后来,他的职责有所增加,包括:从项目到自然界的定期移交,控制施工对项目的合规性测量,物料运输量的计算,监视和记录施工期间发生的变化以及测量和绘图的施工计划在正式记录中进行注册。 ud

著录项

  • 作者

    Bonča Klemen;

  • 作者单位
  • 年度 2011
  • 总页数
  • 原文格式 PDF
  • 正文语种 {"code":"sl","name":"Slovene","id":39}
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号