首页> 外文OA文献 >A suggestion of the arrangement of the river Sava’s left bank in the area of Vrbina at the planned accumulation lake of the hydro power plant Brežice
【2h】

A suggestion of the arrangement of the river Sava’s left bank in the area of Vrbina at the planned accumulation lake of the hydro power plant Brežice

机译:关于萨瓦河左岸在伏尔比纳地区布列日采水电站计划蓄积湖的布置的建议

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

In the graduation thesis I represent a suggestion to wholesome arrangement of the area near the planned accumulation lake of the hydropower station Brežice. Primary purpose is to build a gravel pit for ensuring covering the deficit of the material for hydro power plants construction, dams and dykes in particular, at the lower stream of the Sava river. The gravel grave will be used as additional accumulation by arranging it and filling it with water improving its installation to the area. The additional accumulation can be used also for tourist- recreational purposes, building a kayak water course, arrangement of the forest peninsula, walking paths, marshes and similar. The present work includes also appreciation of the volumes of materials from gravel pit, water regime in the additional accumulation for different extreme years and different hydraulic solutions of regulation of flows with calculations. On the other side there is also a problem of the water organisms’ migrations after the hydro power plants at the lower stream of Sava are constructed. The solution would be fish-ways, which do not function as they should in Slovenia as they represent a waste of energy for hydro power plants. The alternative solution of the fish-way in the concept of the whole arrangement of the area near the accumulation of the hydropower plant Brežice is presented including the power saving project.
机译:在毕业论文中,我建议对布列日采水电站计划中的蓄水池附近区域进行有益的布置。主要目的是建立一个砾石坑,以确保覆盖萨瓦河下游的水力发电设施,尤其是大坝和堤坝的材料短缺。砾石坟墓将通过布置并填充水来用作额外的堆积物,以改善其在该地区的安装。额外的堆积物还可以用于旅游休闲目的,建造皮划艇水道,安排森林半岛,人行道,沼泽等。目前的工作还包括对砾石坑中的物料量,不同极端时期额外积聚中的水状态以及计算流量的不同水力解决方案进行评估。另一方面,在萨瓦河下游的水力发电厂建成后,水生物迁移也存在问题。解决方案将是鱼路,由于它们代表了水力发电厂的能源浪费,因此无法发挥斯洛文尼亚应有的作用。在整个水力发电站Brežice的蓄水区附近的整个布置概念中,提出了鱼路的替代解决方案,其中包括节电项目。

著录项

  • 作者

    Bogataj Dejan;

  • 作者单位
  • 年度 2005
  • 总页数
  • 原文格式 PDF
  • 正文语种 {"code":"sl","name":"Slovene","id":39}
  • 中图分类

相似文献

  • 外文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号