首页> 外文OA文献 >Geodetic work in the construction of the precast facility
【2h】

Geodetic work in the construction of the precast facility

机译:预制设施建设中的大地测量工作

摘要

This thesis presents geodetic works during the construction of a precast facility with anudemphasis on the description of the practical implementation of mapping out a facility. Theudcontent of the thesis is divided into three sections. The first section describes the legal basisudwhich specify the geodetic works in construction of buildings. The concepts of construction,udwhich a geodetic surveyor should be very familiar with, are listed and explained. Instrumentsudand software used for mapping out a facility and its surroundings are described inudcontinuation. The main section presents a method for stabilizing a geodetic network, whichudserved surveyors on the field as a base for carrying out the necessary works. A method ofudpolar mapping is described as well as the accuracy of mapping by using this method. Theudpractical section of the thesis relates to the work of a surveyor in the field as well as to anudexplanation of the use of software in mapping out a facility. Surveying of the terrain wasudcarried out for the purpose of calculating the volume of the spoil. The final section presents audmethod for calculating the volumes of the spoil and the results of calculations.
机译:本文介绍了在预制设施建造过程中的大地测量工作,并带有反方括号,描述了对设施进行规划的实际实施情况。论文的主要内容分为三个部分。第一部分描述了法律基础 ud,该法律基础指定了建筑物建造中的大地测量工作。列出并解释了大地测量师应该非常熟悉的构造概念。 udcontinuation中介绍了用于绘制设施及其周围环境的仪器 udand软件。主要部分介绍了一种稳定大地测量网络的方法,该方法为实地测量师提供了必要的基础。描述了极坐标映射的方法以及使用该方法的映射精度。本论文的“实践”部分涉及测量师在该领域的工作,以及对在规划设施中使用软件的解释。为了计算弃土量,对地形进行了调查。最后一部分介绍了一种计算弃土量和计算结果的方法。

著录项

  • 作者

    Pavlović Darko;

  • 作者单位
  • 年度 2016
  • 总页数
  • 原文格式 PDF
  • 正文语种
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号