首页> 外文OA文献 >Impact of defective production of asphalt mixture resulting in damaged asphalt layers
【2h】

Impact of defective production of asphalt mixture resulting in damaged asphalt layers

机译:沥青混合料生产不良导致沥青层受损的影响

摘要

In practice it often happens that a newly built road soon, after the asphalt mixture is added, starts showing first cracks and damages, which are not necessarily always a fault of the contractor, who built in the asphalt mixture, but can derive from the production of asphalt mixture. Such mistakes in the production of the asphalt mixture are hard to prove, since all the contractors usually put the blame on the automatic mixing production in the asphalt plant. During the production of the asphalt mixture, samples of input materials are taken, while the produced asphalt mixture is also sampled at the end of the production process. An inadequate asphalt mixture can be produced within the asphalt plant due to the damages in its machinery, inadequate input materials or the human factor plays a role in it, since we must not forget that all the machinery within the asphalt plant and computer programmes are supervised by man. Human factor also plays a role in the correct storing of input materials. It is the authority of the head of the asphalt plant to decide to ship the mixture to the contractor or not.ududThe Master's thesis researches the reasons for errors in the production which is completely automated since it is based on a computer programme. The current Slovene legislation on the production of asphalt mixtures and technical specification for roadways was analysed. The legislation defines in detail the input materials, parts of the asphalt plant, the production procedure and the enforcement of the control, and includes the contents of the procedural book of quality control in the asphalt plant. All the most common damages to asphalt roadways, which may be a result of errors in the asphalt mixture production and may derive from material deterioration, are given at the end of the Master's thesis. Material deterioration can be a result of inadequate storing of input materials, errors in measuring dosages, temperatures that are too low during the mixing process, the time of mixing and of numerous other reasons. ud
机译:在实践中,经常会发生这样的情况,即在添加沥青混合料后不久,一条新建的道路开始显示出第一道裂缝和破损,这不一定是承包商在沥青混合料中的过错,而是可以由生产而来。沥青混合料。沥青混合料生产中的此类错误很难证明,因为所有承包商通常将责任归咎于沥青厂的自动混合生产。在沥青混合物的生产过程中,会采集输入材料的样品,而生产的沥青混合物也会在生产过程结束时进行采样。由于沥青机械中的机械损坏,输入材料不足或人为因素的影响,可能会在沥青工厂内生产出不足的沥青混合物,因为我们不能忘记对沥青工厂内的所有机械和计算机程序进行监督靠男人人为因素在正确存储输入材料中也起着作用。沥青厂负责人有权决定是否将混合物运送到承包商。 ud ud硕士论文研究了生产错误的原因,由于它是基于计算机程序的,因此是完全自动化的。分析了斯洛文尼亚现行有关沥青混合料生产的法规和道路技术规范。立法详细定义了沥青厂的投入材料,零件,生产程序和控制措施的执行,并包括了沥青厂质量控制程序手册的内容。在硕士学位论文的末尾给出了对沥青路面的所有最常见的损坏,这些损坏可能是由于沥青混合料生产中的错误,也可能是由于材料变质引起的。材料变质可能是由于输入材料的存储不足,计量剂量错误,混合过程中温度过低,混合时间以及许多其他原因造成的。 ud

著录项

  • 作者

    Hrovat Tea;

  • 作者单位
  • 年度 2013
  • 总页数
  • 原文格式 PDF
  • 正文语种 {"code":"sl","name":"Slovene","id":39}
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号