首页> 外文OA文献 >Recalculation of levelling network of hydroelectric power plant formn between the years 2004 and 2012
【2h】

Recalculation of levelling network of hydroelectric power plant formn between the years 2004 and 2012

机译:重新计算2004年至2012年之间的水力发电厂水准网

摘要

In agreement with the regulations in force, the Hydroelectric Power Plant (HPP) Formin performs two land surveying measurements per year. The objective is to determine the stability of the facility. Considering the unusual altitudinal changes in the intake channel of the HPP Formin, this thesis reveals the data of controlling the stability of the first benchmark R1 on a house in the vicinity of the hydroelectric power plant. On the basis of the controls, a complete calculation of all measured heights of all measured pillars, controlling points and benchmarks between 2004 and 2012 had been done. All measurements and data processing closely follow the recommendations for geotechnical measuring and thus the highest standards in land surveying are met. A statistical analysis had been done and on its basis we determined the stability of referential pillars and vertical movements on controlling points and benchmarks. All results are adequately interpreted and illustrated with graphs and tables. I conclude the thesis with recommendations for future land surveys at the Hydroelectric Power Plant Formin.
机译:根据现行法规,Formin水电站(HPP)每年执行两次土地测量。目的是确定设施的稳定性。考虑到HPP Formin进气道的高度变化,本文揭示了控制水力发电厂附近房屋第一基准R1稳定性的数据。在控制的基础上,已经完成了对2004年至2012年期间所有测得的支柱,控制点和基准的所有测得的高度的完整计算。所有的测量和数据处理都严格遵循岩土测量的建议,因此符合土地测量的最高标准。进行了统计分析,并在此基础上确定了参考点的稳定性以及控制点和基准上的垂直运动。所有结果都得到了充分的解释,并用图表表示。最后,本文提出了对Formin水力发电厂进行土地调查的建议。

著录项

  • 作者

    Žlender Jera;

  • 作者单位
  • 年度 2012
  • 总页数
  • 原文格式 PDF
  • 正文语种 {"code":"sl","name":"Slovene","id":39}
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号