Each building or each project that is constructed nowadays is planned to be built as fast and cheap asudpossible. A large extent and considerable intensiveness of works bring about many problems duringudconstruction. In order to avoid them, numerous companies opt for preliminary project schedules thatudprovide them with approximate duration of individual activities. One of the main problems of audproject, which I analyse in my thesis, is time discrepancies of individual activities. I analysed thisudproblem with the program Microsoft Project. This program enables planning of individual projects'udduration. Using the program, I analysed and explained all time delays that had occurred during theudanalysed project. In addition to time delays, discrepancies in final prices of projects are also a frequentudoccurrence in the construction sector. These discrepancies mostly depend on “construction surprises”udor additional works that become necessary and are added during the building phase. The priceuddifference was compared on the basis of a contractual quotation and a book of account dimensions. Iudmade an Excel file into which I entered all the data necessary for a subsequent calculation of theudabove-mentioned discrepancies. A project quotation for this type of analysis or price comparison isudirrelevant as it is a mere project evaluation by designer.
展开▼