首页> 外文OA文献 >Optimally routing and scheduling tow trains for JIT-supply of mixed-model assembly lines
【2h】

Optimally routing and scheduling tow trains for JIT-supply of mixed-model assembly lines

机译:混合模型装配线的JIT供应的最优列车安排和调度

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

In recent years, more and more automobile producers adopted the supermarket-concept to enable a flexible and reliable Just-in-Time (JIT) part supply of their mixed-model assembly lines. Within this concept, a supermarket is a decentralized in-house logistics area where parts are intermediately stored and then loaded on small tow trains. These tow trains travel across the shop floor on specific routes to make frequent small-lot deliveries which are needed by the stations of the line. To enable a reliable part supply in line with the JIT-principle, the interdependent problems of routing, that is, partitioning stations to be supplied among tow trains, and scheduling, i.e., deciding on the start times of each tow train's tours through its assigned stations, need to be solved. This paper introduces an exact solution procedure which solves both problems simultaneously in polynomial runtime. Additionally, management implications regarding the trade-off between number and capacity of tow trains and in-process inventory near the line are nvestigated within a comprehensive computational study.
机译:近年来,越来越多的汽车生产商采用了超级市场概念,以实现其混合模型装配线的灵活,可靠的准时(JIT)零件供应。在这个概念中,超级市场是分散的内部物流区域,在该区域中,零件被中间存储,然后装载到小型拖车上。这些拖车在特定的路线上穿越车间,以进行频繁的小批量交付,这是线路的站点所需要的。为了使可靠的零件供应符合JIT原则,路由的相互依赖的问题,即在拖车之间提供分隔站,并进行调度,即通过分配的拖车确定每辆火车的行程开始时间站,需要解决。本文介绍了一种精确的求解过程,该过程可以在多项式运行时中同时解决这两个问题。此外,在综合计算研究中研究了有关牵引列车数量和容量与生产线附近过程中库存之间的折衷的管理意义。

著录项

  • 作者

    Simon Emde; Nils Boysen;

  • 作者单位
  • 年度 2011
  • 总页数
  • 原文格式 PDF
  • 正文语种
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号