首页> 外文OA文献 >Combined cut and cover and new Austrian tunnelling methods for MRT station in Bangkok sub-Soils
【2h】

Combined cut and cover and new Austrian tunnelling methods for MRT station in Bangkok sub-Soils

机译:曼谷子土地铁站的挖剪结合和新奥地利挖洞方法

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

Ground and wall movements in an excavation using a combined cut-and-cover method and New Australian Tunnelling Method (NATM) for an MRT station is studied by means of a 2D finite element analysis. An advanced elasto-plastic constitutive law is adopted to model the soil behavior. Multi-stage construction of both the cut-and-cover box and NATM excavation are modeled. Ground surface settlements behind diaphragm walls induced by the cut-and-cover excavation are in good agreement with those calculated from the simplified method. Deflection of diaphragm wall on the NATM excavation side was smaller than that of the opposite side due to stress release from the tunnel excavation. However, ground surface settlements increased three times of the settlement occurring after the excavation of the cut-and-cover box.
机译:通过二维有限元分析,研究了结合捷运法和新澳大利亚隧道法(NATM)的捷运站地面和墙体运动。采用先进的弹塑性本构法对土壤行为进行建模。对可拆装箱和NATM开挖的多阶段构造进行了建模。由开挖和覆盖开挖引起的地下连续墙后的地面沉降与简化方法计算的沉降非常吻合。由于从隧道开挖中释放的应力,NATM开挖侧的隔板壁挠度小于相对侧。但是,地表沉降增加了开挖覆盖盒之后发生的沉降的三倍。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号