首页> 外文OA文献 >Sustainable building refurbishment : process based approaches with the Hotel Klaus K refurbishment case.
【2h】

Sustainable building refurbishment : process based approaches with the Hotel Klaus K refurbishment case.

机译:可持续建筑翻新:Hotel Klaus K翻新案例基于过程的方法。

摘要

The refurbishment of existing buildings plays a significant role in contemporary urban scenery for a sustainable environment. Well planned refurbishment can extend the life cycle of a building. In addition, a great deal of energy conservation can be achieved in the building sector through improving existing building stock. Yet, as sustainable refurbishment is still new in the field of construction, the scope of work and the process are not well organized. This thesis therefore tries to understand the differences between the conventional process of refurbishment and a more sustainable process. Targets, criteria and approaches to sustainable refurbishment should also differ from other projects. As every building is unique, not only in its structure, technical system and typology but also in local context, incorporating surroundings and historical and cultural qualities, approaches towards building refurbishment should vary according to these conditions.The thesis analyses diverse approaches to sustainable refurbishment through methodological frameworks, market-available tools and several example cases. To apply studied approaches to a practical case, the Hotel Klaus K refurbishment is introduced with entailed specific project conditions and local context. Interviews with project members involved in the refurbishment case help to understand the different roles and interests of each member and to examine the actual process of decision making. Based on the project analysis, the last part of the thesis suggests ideal processes and target and holistic scenarios for sustainable refurbishment in the Hotel Klaus K project.In general, diverse stakeholders and project members are engaged in decision making process of a refurbishment project. Moreover, many constraints result from conditions of an existing building and residents which represent limitations to architects, preventing them from exerting the full capacity of free design. Architects should be able to understand the actual uses of existing buildings and residents and communicate with diverse project members from the initial phase of a project to the end of a refurbishment. Accordingly, the role of architects should be extended to include planning extra work and the process of sustainable refurbishment. Ultimately, the thesis aims to draw an innovative path towards sustainable refurbishment by extending the role of architects.
机译:现有建筑的翻新对于当代城市景观的可持续发展起着重要作用。精心计划的翻新工程可以延长建筑物的使用寿命。此外,通过改善现有建筑存量,可以在建筑部门实现大量节能。然而,由于可持续的翻新在建筑领域仍然是新事物,因此工作范围和过程没有很好的组织。因此,本论文试图了解常规翻新过程与更可持续的过程之间的区别。可持续翻新的目标,标准和方法也应与其他项目不同。由于每座建筑不仅在结构,技术体系和类型上而且在当地情况下都是独特的,因此要结合周围环境以及历史和文化特质,因此建筑翻新的方法应根据这些条件而有所不同。方法框架,市场可用工具和几个示例案例。为了将研究的方法应用于实际案例,对Klaus K酒店进行了翻新,并引入了特定的项目条件和当地环境。与涉及翻新案例的项目成员的访谈有助于了解每个成员的不同角色和利益,并有助于检查决策的实际过程。在项目分析的基础上,论文最后提出了Hotel Klaus K酒店可持续整修的理想过程,目标和整体方案。总体而言,各利益相关者和项目成员都参与了整修项目的决策过程。此外,许多限制是由于现有建筑物和居民的状况而造成的,这对建筑师构成了限制,使他们无法发挥自由设计的全部能力。建筑师应该能够了解现有建筑物和居民的实际用途,并能够从项目的初始阶段到装修结束与各种项目成员进行沟通。因此,建筑师的作用应扩大到包括计划额外的工作和可持续翻新的过程。最终,本文旨在通过扩展建筑师的作用为可持续的翻新画出一条创新之路。

著录项

  • 作者

    Ryu Haeyeon;

  • 作者单位
  • 年度 2014
  • 总页数
  • 原文格式 PDF
  • 正文语种 en
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号